SAM.govW912BU26RA013
Open
Oldmans Dredged Material Placement Facility (DMPF) Dike Raising Construction
- Response deadline
- May 27, 2026 Closed
- Date posted
- Apr 27, 2026
- Source
- Open notice
Description
The purpose of Amendment 0001 to Solicitation W912BU26RA013 is as follows: a.) To revise the proposal due date from 1:00 PM Eastern 25 MAY 2026 to 1:00PM Eastern 27 MAY 2026.W912BU26RA0130001. b.) To incorporate Request for Information (RFI) instructions and the associated deadline for the submission of questions to Section 00 21 00. c.) To incorporate FAR 52.222-90 Addressing DEI Discrimination by Federal Contractors. d.) Update FAR 52.252-3, Alterations in Solicitation
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)
- FWS - Pixley NWR Water Recirculation Design-BuildDue Nov 30, 2026
- Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 24-Inch Diameter) Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging - JBJ WaterwayMississippiDue Nov 16, 2026
- Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 18-Inch Diameter) Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging - MS River HarborsMississippiDue Nov 16, 2026
- St. Lucie South Jetty Repair Industry DayFloridaDue Dec 7, 2026
- Repair Aids to Navigation (ATON) - Southern Area of USCG District NortheastConnecticutDue Dec 8, 2026