WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- Response deadline
- Aug 31, 2026 Due in 20 days
- Date posted
- Aug 11, 2026
- Source
- Open notice
Description
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 07 - 11 August 2026 1) Due to the revised Statement of Work, and Drawings, this solicitation will be opened up for a second round of RFI's 2) RFI's will be due 13 August 2026 @ 1400 (2:00 pm) 3) RFI's are to be sent to SSgt Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 06 - 5 August 2026 1) A revised Statmenet of Work labeled "250063_ATT01_SOW_Amend_01" has been posted to the attachments section of this solicitation. 2) Revised drawings labeled "250063_ATT02_Drawings_Amend_01" have been posted to the the attachments section of this solicitation. 3) Proposals are due 31 August 2026 @ 1400 (2:00 PM) CST 4) Proposals are to be sent to SSgt. Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 05 - 31 JULY 2026 1) Prebid RFI Responses have been posted to the attachments section and are labeled: "250063_Prebid RFI Responses" 2) Proposals are due 31 August 2026 @ 1400 (2:00 pm) CST. 3) Proposals are to be sent to SSgt. Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 04 - 23 JULY 2026 1) An updated Site Visit Sign in Sheet has been posted. 2) RFI's are due 24 July 2026 @ 1400 (2:00 pm) CST THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 03 - 20 JULY 2026 1) Due to several missed RSVP's an additional site visit will be held 21 July 2026 @ 1230 (12:30 PM) 2) If you attended the first site visit you are not required to attend the additional site visit 3) If you wish to attend the additional site visit please send an RSVP to SSgt Isaac Demmers at isaac.demmers@us.af.mil by 1800 (6:00 pm) on 20 July 2026 THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 02 - 20 JULY 2026 1) The site visit for this requirement was conducted on 20 July 2026 2) RFI's are due 24 July 2026 @ 1400 (2:00 pm) CST 3) The site visit sign in sheet has been posted in the attachments THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 01 - 13 JULY 2026 1) The official solicitation document for this requirement labeled (Solicitation - FA813726R0026) has been replaced to refelct an issue date of: 13 Jul 2026 2) All other terms and conditions remain the same THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY After review of the project specific documents, if you are a SBA Certified WOSB, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access. After receipt of your RSVP and EAL if required, Initial Site Visit is set for Monday, 20 July, 2026 at 0900 (9:00 am) CST. The meet up location for the site visit will be at the North West Parking lot of Building 9001. Approximate coordinates are: 35°23'43.9"N 97°23'56.8"W -- An attachment titled "Site Visit Meet Up Location" can be found in the attachments and gives the specific details and visual for the meet up point. You must attend the initial Site Vist for the project, to be considered eligible to propose. Please submit your RSVP to SSgt Isaac Demmers at "isaac.demmers@us.af.mil". THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
Classifications
Documents (105)
- Download4500-CIVIL.pdf.pdf14.0 MB
- DownloadesvEH_singledual_2023_V2.pdf.pdf267 KB
- Download01 32 16.00 20.pdf.pdf28 KB
- Download03 01 00.pdf.pdf148 KB
- Download10 44 16.pdf.pdf14 KB
- DownloadTAFB B9001 VAV Schedule.pdf.pdf6 KB
- Download23 00 00.pdf.pdf245 KB
- Download23 05 48.00 40.pdf.pdf49 KB
- DownloadSOW Att 02c_Controlled Area Training - Certificate.pdf.pdf467 KB
- Download00 71 00.pdf.pdf1.5 MB
- Download08 51 23.pdf.pdf38 KB
- Download23 09 23.02.pdf.pdf168 KB
- Download00 80 00.pdf.pdf8 KB
- Download00 70 00.pdf.pdf897 KB
- Download2026 TAFB Mechanical Standard_signed.pdf.pdf1.2 MB
- DownloadMechanical Schedules.xls.xls1.3 MB
- DownloadSOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx.xlsx16 KB
- Download08 81 00.pdf.pdf57 KB
- Download10 22 13.pdf.pdf22 KB
- Download08 71 00.pdf.pdf59 KB
- Download250063 React VII_Hardware schedule 25MAR26 JL.xlsx.xlsx17 KB
- Download2_-_HE05-JINV-S11EE---GNT---L_001.pdf.pdf55 KB
- Download250063_ATT02_Drawings_Amend_01.pdf.pdf13.8 MB
- Download2026 TAFB FIRE PROTECTION STANDARD.pdf.pdf341 KB
- Download23 05 15.pdf.pdf151 KB
- Download26 51 00 INTERIOR LIGHTING.pdf.pdf101 KB
- Download00 80 05.pdf.pdf10 KB
- Downloadoverall plan 04.15.2021.pdf.pdf184 KB
- Download01 33 00.pdf.pdf856 KB
- Download01 78 23.pdf.pdf34 KB
- DownloadARCH-COMBINED.pdf.pdf41.2 MB
- Download01 78 00.pdf.pdf1.4 MB
- Download05 40 00.pdf.pdf42 KB
- DownloadELECTRICAL PANEL SCHEDULE U18L.xlsx.xlsx23 KB
- Download07 21 16.pdf.pdf26 KB
- Downloadlrad331965pd_spec.pdf.pdf384 KB
- Download07 14 00.pdf.pdf40 KB
- Download28 31 76.pdf.pdf200 KB
- Download2020 TAFB Facility Standard.pdf.pdf5.8 MB
- Download250063_ATT 9_SOW.pdf.pdf373 KB
- DownloadREACT VII SA-01.pdf.pdf340 KB
- Download2026 TAFB Electrical Standard - Signed.pdf.pdf523 KB
- DownloadDoor_Window_Schedule.xlsx.xlsx18 KB
- Download09 67 23.15.pdf.pdf90 KB
- Downloadimage (1).png.png243 KB
- Download23 05 93.pdf.pdf57 KB
- DownloadHE05IN_Dimension_Drawing.pdf.pdf194 KB
- DownloadSite Visit Meet Up Location.png.png1.5 MB
- Download21 13 13.pdf.pdf103 KB
- DownloadDESV_Submittal.pdf.pdf457 KB
- Download250063_Prebid RFI Responses.pdf.pdf224 KB
- Download4500-S.pdf.pdf14.0 MB
- Downloadafi48-104.pdf.pdf317 KB
- Downloadimage.png.png66 KB
- Download10 14 00.10.pdf.pdf42 KB
- DownloadSOW Att 01_Appointment of Security Representative Template 496.docx.docx101 KB
- DownloadRoom finish schedule.xlsx.xlsx10 KB
- Download01 45 00.00 10.pdf.pdf36 KB
- Download00 72 00.pdf.pdf5.3 MB
- DownloadSOW Att 02a_Controlled Area Training.pptx.pptx651 KB
- Download4500-MUG.pdf.pdf13.6 MB
- Download26 20 00.pdf.pdf187 KB
- DownloadJOIST SPECIAL INSPECTIONS.xlsx.xlsx10 KB
- Download07 92 00.pdf.pdf43 KB
- Download01 33 16.00 10.pdf.pdf86 KB
- Download08 11 13.pdf.pdf39 KB
- Download23 36 00.00 40.pdf.pdf90 KB
- Download250063_ATT 10_Submittal Register.xlsx.xlsx70 KB
- DownloadERV Schedule_TAFB B9001_O-212477.xlsx.xlsx8 KB
- DownloadWWYK250063-04March2026.pdf.pdf76 KB
- Download22 00 00.pdf.pdf359 KB
- Download250063_ATT 11_Drawings.pdf.pdf13.9 MB
- Downloadlk406gn05t4_spec.pdf.pdf220 KB
- Download26 05 73 POWER STUDIES.pdf.pdf4.6 MB
- Download08 33 23.pdf.pdf47 KB
- DownloadSite Visit Sign in Sheet - WWYK250063.jpg.jpg27 KB
- Download06 41 16.00 10.pdf.pdf57 KB
- Download05 05 23.16.pdf.pdf34 KB
- Downloadesvperf_singledual_2023_V2.pdf.pdf670 KB
- Download09 90 00.pdf.pdf139 KB
- Download23 09 13.pdf.pdf171 KB
- Downloadz415-bz1.pdf.pdf286 KB
- Download250063_ATT 10_Submittal Register.pdf.pdf360 KB
- Download000_TABLE OF CONTENTS.pdf.pdf70 KB
- Download250063_ATT01_SOW_Amend_01.pdf.pdf374 KB
- Download23 64 26.pdf.pdf165 KB
- Download23 07 00.pdf.pdf233 KB
- DownloadELECTRICAL COMBINED.pdf.pdf50.0 MB
- DownloadHELICAL PILES NOTES.docx.docx15 KB
- Download250063_ATT 4_ODS.pdf.pdf157 KB
- DownloadPILE SCHEDULE.xlsx.xlsx11 KB
- DownloadUMRL.pdf.pdf686 KB
- DownloadWWYK250063-04March2026 1.docx.docx425 KB
- Download23 03 00.pdf.pdf25 KB
- Downloadz400i.pdf_safe.pdf.pdf121 KB
- Download220042 As Built Drawings.pdf.pdf11.9 MB
- Download10 14 00.20.pdf.pdf30 KB
- Download23 31 13.00 40.pdf.pdf182 KB
- Download01 42 00.pdf.pdf10 KB
- Download01 50 00.pdf.pdf300 KB
- DownloadSolicitation - FA813726R0026.pdf.pdf703 KB
- Download23 08 00.pdf.pdf163 KB
- Download07 84 00.pdf.pdf32 KB
- DownloadSite Visit Sign In Sheet.jpg.jpg93 KB
- Download250063_ATT 3_RMDF.pdf.pdf265 KB
Contacts
Similar contracts
- DFC B95 and B810 Lighting ControlsColoradoDue Aug 26, 2026
- Renovate B203 for C130 J ConversionOhioDue Sep 9, 2026
- Airfield Joint Sealant Repairs, RVKQ-21-0019New YorkDue Sep 10, 2026
- Wichita VA Medical Center Campus Wayfinding Site Visit MapKansas
- Repair B632, Fire Suppression and Hangar DoorIllinoisDue Aug 19, 2026
- SolicitationDue Aug 20, 2026