WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- Response deadline
- Sep 4, 2026 Due in 9 days
- Date posted
- Aug 26, 2026
- Source
- Open notice
Description
THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 08 - 26 August 2026 1) 2nd round of Prebid RFI Responses have been posted to the attachments section and are labeled: "250063_Pre-Bid RFI_Responses Round 2 COR" 2) The proposal due date has been extend from August 31st 2026 @ 2:00 pm (1400) to September 4th 2026 @ 2:00 pm (1400) 3) The solicitation amendmnet has been posted to the attachments section and is labeled: "Solicitation Amendment FA813726R00260001 SF 30". THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 07 - 11 August 2026 1) Due to the revised Statement of Work, and Drawings, this solicitation will be opened up for a second round of RFI's 2) RFI's will be due 13 August 2026 @ 1400 (2:00 pm) 3) RFI's are to be sent to SSgt Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 06 - 5 August 2026 1) A revised Statmenet of Work labeled "250063_ATT01_SOW_Amend_01" has been posted to the attachments section of this solicitation. 2) Revised drawings labeled "250063_ATT02_Drawings_Amend_01" have been posted to the the attachments section of this solicitation. 3) Proposals are due 31 August 2026 @ 1400 (2:00 PM) CST 4) Proposals are to be sent to SSgt. Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 05 - 31 JULY 2026 1) Prebid RFI Responses have been posted to the attachments section and are labeled: "250063_Prebid RFI Responses" 2) Proposals are due 31 August 2026 @ 1400 (2:00 pm) CST. 3) Proposals are to be sent to SSgt. Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 04 - 23 JULY 2026 1) An updated Site Visit Sign in Sheet has been posted. 2) RFI's are due 24 July 2026 @ 1400 (2:00 pm) CST THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 03 - 20 JULY 2026 1) Due to several missed RSVP's an additional site visit will be held 21 July 2026 @ 1230 (12:30 PM) 2) If you attended the first site visit you are not required to attend the additional site visit 3) If you wish to attend the additional site visit please send an RSVP to SSgt Isaac Demmers at isaac.demmers@us.af.mil by 1800 (6:00 pm) on 20 July 2026 THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 02 - 20 JULY 2026 1) The site visit for this requirement was conducted on 20 July 2026 2) RFI's are due 24 July 2026 @ 1400 (2:00 pm) CST 3) The site visit sign in sheet has been posted in the attachments THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY UDATE 01 - 13 JULY 2026 1) The official solicitation document for this requirement labeled (Solicitation - FA813726R0026) has been replaced to refelct an issue date of: 13 Jul 2026 2) All other terms and conditions remain the same THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY After review of the project specific documents, if you are a SBA Certified WOSB, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access. After receipt of your RSVP and EAL if required, Initial Site Visit is set for Monday, 20 July, 2026 at 0900 (9:00 am) CST. The meet up location for the site visit will be at the North West Parking lot of Building 9001. Approximate coordinates are: 35°23'43.9"N 97°23'56.8"W -- An attachment titled "Site Visit Meet Up Location" can be found in the attachments and gives the specific details and visual for the meet up point. You must attend the initial Site Vist for the project, to be considered eligible to propose. Please submit your RSVP to SSgt Isaac Demmers at "isaac.demmers@us.af.mil". THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY
Classifications
Documents (107)
- 4500-CIVIL.pdf.pdf14.0 MBNot yet available
- esvEH_singledual_2023_V2.pdf.pdf267 KBNot yet available
- 01 32 16.00 20.pdf.pdf28 KBNot yet available
- 03 01 00.pdf.pdf148 KBNot yet available
- 10 44 16.pdf.pdf14 KBNot yet available
- TAFB B9001 VAV Schedule.pdf.pdf6 KBNot yet available
- 23 00 00.pdf.pdf245 KBNot yet available
- 23 05 48.00 40.pdf.pdf49 KBNot yet available
- SOW Att 02c_Controlled Area Training - Certificate.pdf.pdf467 KBNot yet available
- 00 71 00.pdf.pdf1.5 MBNot yet available
- 08 51 23.pdf.pdf38 KBNot yet available
- 23 09 23.02.pdf.pdf168 KBNot yet available
- 00 80 00.pdf.pdf8 KBNot yet available
- 00 70 00.pdf.pdf897 KBNot yet available
- 2026 TAFB Mechanical Standard_signed.pdf.pdf1.2 MBNot yet available
- Mechanical Schedules.xls.xls1.3 MBNot yet available
- SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx.xlsx16 KBNot yet available
- 08 81 00.pdf.pdf57 KBNot yet available
- 10 22 13.pdf.pdf22 KBNot yet available
- 08 71 00.pdf.pdf59 KBNot yet available
- 250063 React VII_Hardware schedule 25MAR26 JL.xlsx.xlsx17 KBNot yet available
- 2_-_HE05-JINV-S11EE---GNT---L_001.pdf.pdf55 KBNot yet available
- 250063_ATT02_Drawings_Amend_01.pdf.pdf13.8 MBNot yet available
- 2026 TAFB FIRE PROTECTION STANDARD.pdf.pdf341 KBNot yet available
- 23 05 15.pdf.pdf151 KBNot yet available
- 26 51 00 INTERIOR LIGHTING.pdf.pdf101 KBNot yet available
- 00 80 05.pdf.pdf10 KBNot yet available
- 250063_Pre-Bid RFI_Responses Round 2 COR.pdf.pdf290 KBNot yet available
- overall plan 04.15.2021.pdf.pdf184 KBNot yet available
- 01 33 00.pdf.pdf856 KBNot yet available
- 01 78 23.pdf.pdf34 KBNot yet available
- Solicitation Amendment FA813726R00260001 SF 30.pdf.pdf219 KBNot yet available
- ARCH-COMBINED.pdf.pdf41.2 MBNot yet available
- 01 78 00.pdf.pdf1.4 MBNot yet available
- 05 40 00.pdf.pdf42 KBNot yet available
- ELECTRICAL PANEL SCHEDULE U18L.xlsx.xlsx23 KBNot yet available
- 07 21 16.pdf.pdf26 KBNot yet available
- lrad331965pd_spec.pdf.pdf384 KBNot yet available
- 07 14 00.pdf.pdf40 KBNot yet available
- 28 31 76.pdf.pdf200 KBNot yet available
- 2020 TAFB Facility Standard.pdf.pdf5.8 MBNot yet available
- 250063_ATT 9_SOW.pdf.pdf373 KBNot yet available
- REACT VII SA-01.pdf.pdf340 KBNot yet available
- 2026 TAFB Electrical Standard - Signed.pdf.pdf523 KBNot yet available
- Door_Window_Schedule.xlsx.xlsx18 KBNot yet available
- 09 67 23.15.pdf.pdf90 KBNot yet available
- image (1).png.png243 KBNot yet available
- 23 05 93.pdf.pdf57 KBNot yet available
- HE05IN_Dimension_Drawing.pdf.pdf194 KBNot yet available
- Site Visit Meet Up Location.png.png1.5 MBNot yet available
- 21 13 13.pdf.pdf103 KBNot yet available
- DESV_Submittal.pdf.pdf457 KBNot yet available
- 250063_Prebid RFI Responses.pdf.pdf224 KBNot yet available
- 4500-S.pdf.pdf14.0 MBNot yet available
- afi48-104.pdf.pdf317 KBNot yet available
- image.png.png66 KBNot yet available
- 10 14 00.10.pdf.pdf42 KBNot yet available
- SOW Att 01_Appointment of Security Representative Template 496.docx.docx101 KBNot yet available
- Room finish schedule.xlsx.xlsx10 KBNot yet available
- 01 45 00.00 10.pdf.pdf36 KBNot yet available
- 00 72 00.pdf.pdf5.3 MBNot yet available
- SOW Att 02a_Controlled Area Training.pptx.pptx651 KBNot yet available
- 4500-MUG.pdf.pdf13.6 MBNot yet available
- 26 20 00.pdf.pdf187 KBNot yet available
- JOIST SPECIAL INSPECTIONS.xlsx.xlsx10 KBNot yet available
- 07 92 00.pdf.pdf43 KBNot yet available
- 01 33 16.00 10.pdf.pdf86 KBNot yet available
- 08 11 13.pdf.pdf39 KBNot yet available
- 23 36 00.00 40.pdf.pdf90 KBNot yet available
- 250063_ATT 10_Submittal Register.xlsx.xlsx70 KBNot yet available
- ERV Schedule_TAFB B9001_O-212477.xlsx.xlsx8 KBNot yet available
- WWYK250063-04March2026.pdf.pdf76 KBNot yet available
- 22 00 00.pdf.pdf359 KBNot yet available
- 250063_ATT 11_Drawings.pdf.pdf13.9 MBNot yet available
- lk406gn05t4_spec.pdf.pdf220 KBNot yet available
- 26 05 73 POWER STUDIES.pdf.pdf4.6 MBNot yet available
- 08 33 23.pdf.pdf47 KBNot yet available
- Site Visit Sign in Sheet - WWYK250063.jpg.jpg27 KBNot yet available
- 06 41 16.00 10.pdf.pdf57 KBNot yet available
- 05 05 23.16.pdf.pdf34 KBNot yet available
- esvperf_singledual_2023_V2.pdf.pdf670 KBNot yet available
- 09 90 00.pdf.pdf139 KBNot yet available
- 23 09 13.pdf.pdf171 KBNot yet available
- z415-bz1.pdf.pdf286 KBNot yet available
- 250063_ATT 10_Submittal Register.pdf.pdf360 KBNot yet available
- 000_TABLE OF CONTENTS.pdf.pdf70 KBNot yet available
- 250063_ATT01_SOW_Amend_01.pdf.pdf374 KBNot yet available
- 23 64 26.pdf.pdf165 KBNot yet available
- 23 07 00.pdf.pdf233 KBNot yet available
- ELECTRICAL COMBINED.pdf.pdf50.0 MBNot yet available
- HELICAL PILES NOTES.docx.docx15 KBNot yet available
- 250063_ATT 4_ODS.pdf.pdf157 KBNot yet available
- PILE SCHEDULE.xlsx.xlsx11 KBNot yet available
- UMRL.pdf.pdf686 KBNot yet available
- WWYK250063-04March2026 1.docx.docx425 KBNot yet available
- 23 03 00.pdf.pdf25 KBNot yet available
- z400i.pdf_safe.pdf.pdf121 KBNot yet available
- 220042 As Built Drawings.pdf.pdf11.9 MBNot yet available
- 10 14 00.20.pdf.pdf30 KBNot yet available
- 23 31 13.00 40.pdf.pdf182 KBNot yet available
- 01 42 00.pdf.pdf10 KBNot yet available
- 01 50 00.pdf.pdf300 KBNot yet available
- Solicitation - FA813726R0026.pdf.pdf703 KBNot yet available
- 23 08 00.pdf.pdf163 KBNot yet available
- 07 84 00.pdf.pdf32 KBNot yet available
- Site Visit Sign In Sheet.jpg.jpg93 KBNot yet available
- 250063_ATT 3_RMDF.pdf.pdf265 KBNot yet available
Contacts
Similar contracts
- Design-Build Warehouse Construction Services, U.S. Embassy Kolonia, Federated States of MicronesiaPohnpeiDue Sep 10, 2026
- FPL B49 Fire Hydrant ReplacementWisconsinDue Sep 10, 2026
- Matsushima JASDF Base Storage ShelterMiyagiDue Sep 16, 2026
- Market Survey – Industry Insights on Industrialized Construction (IC) Methodologies for Army Installation ResilienceHesseDue Sep 26, 2026
- FY28 Frequency Converter Plant, Yokohama North DockDue Sep 16, 2026
- N33191-26-R-0032 D-B Maritime Center of Excellence Phase III TunisiaDue Sep 11, 2026