Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501
- Response deadline
- Aug 31, 2026 Closed
- Date posted
- Aug 10, 2026
- Source
- Open notice
Description
THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY UPDATE 04 - 10 AUGUST 2026 1) A revised Statement of Work labeled "240176_ATT02_STATEMENT OF WORK_Admendment 2" has been posted to the attachments sections of this solicitation 2) Revised drawings labeled "240176_ATT03_Amendment 2_Drawings" have been posted to the attachments section of this solicitation 3) A revised Design Narrative labeled "240176_ATT01_Design Narrative_Amendment 2" has been posted to the attachments secitons of this soliciation 4) Proposals are due 31 August 2026 @ 1400 (2:00 PM) CST 5) Proposals are to be sent to SSgt. Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY UPDATE 03 - 31 JULY 2026 1) Prebid RFI Responses have been posted to the attachments section and are labeled: "WWYK240176 Pre Bid RFI's" 2) Proposals are due 31 August 2026 @ 1400 (2:00 pm) CST. 3) Proposals are to be sent to SSgt. Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY UPDATE 02 - 23 JULY 2026 1) The Site Visit Sign In sheet has been posted in the attachments section 2) RFI responses from the previous solicitation have been posted in the attachments section 3) RFI's are due 27 July 2026 @ 1400 (2:00 pm). Please send RFI's to SSgt Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY UPDATE 01 - 22 JULY 2026 1) The site visit was conducted on 21 July 2026 2) RFI's are due 27 July 2026 @ 1400 (2:00 pm). Please send RFI's to SSgt Isaac Demmers at isaac.demmers@us.af.mil. 3) The site visit sign in sheet will be posted on 23 July 2026 THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY Project Title: WWYK240176 - REPLACE INDUSTRIAL WASTE LIFT STATIONS 6N & 6S, B62501 Rehabilitate or replace LS-6N&S (B2122). Consider future flows. Consider if LS-6N&S can be combined into a single LS. Consider if wet well structure can be combined, reused, and/or rehabilitated with a coating system or liner. The work to be performed under the terms of this order consists of furnishing all design/engineering services, material, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the demo and replacement of the industrial waste lift stations (IWLS) 6N and 6S at Tinker Air Force Base (AFB), Oklahoma. Project specific documents are attached to this posting. If you experience any difficulty at receiving or accessing the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission sent to your email. In the email, please provide email addresses for Prime Contractors points of contact ONLY, to have a DoD Safe link sent to. Do not include any sub-contractor email addresses. THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access. After receipt of your RSVP and EAL if required, Initial Site Visit is set for Tuesday, 21 July, 2026 at 0900 (9:00 am). The meet up location for the site visit will be held near building 2122. Approximate coordinates are: 35°24'33.3"N 97°22'17.2"W. An attachment titled "Site Visit Meet-up Point" attached below gives the specific details and visual for the meet up point. You must attend the initial Site Vist for the project, to be considered eligible to propose. Please submit your RSVP to SSgt Isaac Demmers at "isaac.demmers@us.af.mil". THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY
Classifications
Documents (122)
- DownloadWWYK143004_CU503.pdf.pdf367 KB
- Downloadtinkerafbi21-100.pdf.pdf213 KB
- DownloadEM_385-1-1.pdf.pdf10.1 MB
- Downloaddafi13-213.pdf.pdf1.2 MB
- Download240176_ATT 11_Submittal Register.xlsx.xlsx20 KB
- Download240176_STATEMENT OF WORK-Amendment 1.pdf.pdf318 KB
- Download1993_IndWaste.pdf.pdf1.1 MB
- Download00 70 00.pdf.pdf897 KB
- DownloadIndustrial Waste Lines 1969.pdf.pdf9.4 MB
- Downloadafman32-7003.pdf.pdf1.3 MB
- DownloadWWYK143004_CU513.pdf.pdf344 KB
- DownloadERDCITL_TR12-6_r6.pdf.pdf1.5 MB
- Download480211.pdf.pdf445 KB
- Download240176_ATT 3_Green Procurement Statement.pdf.pdf278 KB
- DownloadWWYK143004_CU514.pdf.pdf617 KB
- Downloaddafi13-213_tinkerafbsup.pdf.pdf687 KB
- Download017800_Attch1_DD1354.pdf.pdf93 KB
- DownloadWWYK143004_CU501.pdf.pdf473 KB
- DownloadSOW Att 01_Appointment of Security Representative Template 496.docx.docx101 KB
- Downloadtinkerafb_INRMP_App G.pdf.pdf4.6 MB
- DownloadWWYK143004_CU504.pdf.pdf384 KB
- Download00 80 00.pdf.pdf8 KB
- Download01 78 23.pdf.pdf34 KB
- Download1995_IndWaste.pdf.pdf1.1 MB
- Download240176_ATT03_Amendment 2_Drawings.pdf.pdf5.3 MB
- Downloadufc_3_535_01_2017_c4.pdf.pdf19.8 MB
- Download240176_PRE-BID RFI RESPONSES - COR Signed.pdf.pdf876 KB
- DownloadWWYK143004_CU511.pdf.pdf412 KB
- Download017800_Attch2_DD1354 Checklist.docx.docx44 KB
- Download01 33 00.pdf.pdf856 KB
- Downloadtinkerafb_INRMP.pdf.pdf15.8 MB
- Download007200_Attch14_Information for New Boilers.pdf.pdf144 KB
- DownloadFIRE SUPPRESSION GEODESIC SHOP DRAWINGS AS-BUILTS.pdf.pdf4.2 MB
- Download20010298.pdf.pdf893 KB
- DownloadUMRL.pdf.pdf686 KB
- DownloadWWYK143004_CU502.pdf.pdf716 KB
- Download240176_Site Visit Sign In.pdf.pdf3.8 MB
- Download20090026A.pdf.pdf212 KB
- Download240176_ROUND 3_PRE BID RFIs_For Signature 2 - COR Signed.pdf.pdf442 KB
- DownloadB02119.txt.txt1 KB
- DownloadSOW Att 02a_Controlled Area Training.pptx.pptx651 KB
- DownloadWWYK143004_CU505.pdf.pdf574 KB
- Downloadafman91-203_oc-alcsup.pdf.pdf389 KB
- Download007000_Attch1_TAFB Outage Request Form.pdf.pdf186 KB
- Download013300_Attch1_TAFBF3000.pdf.pdf234 KB
- Download240176_ATT 9_STATEMENT OF WORK.pdf.pdf316 KB
- Download531005.pdf.pdf155 KB
- Downloaddafi21-101_afmcsup_afmcgm2023-01.pdf.pdf2.8 MB
- Download000_TABLE OF CONTENTS.pdf.pdf70 KB
- Download240176_ATT01_Design Narrative_Amendment 2.pdf.pdf342 KB
- Download710238.pdf.pdf1.1 MB
- Downloaddodio-2000.16v1_afi10-245-o.pdf.pdf37 KB
- Download710237.pdf.pdf384 KB
- Download007200_Attch13_AF487.pdf.pdf1.4 MB
- Downloaddafi21-101.pdf.pdf2.5 MB
- DownloadWWYK143004_CU507.pdf.pdf728 KB
- DownloadWWYK143004_CU500.pdf.pdf417 KB
- DownloadWWYK143004_CU508.pdf.pdf444 KB
- Download240176_Final_ Plan Set.pdf.pdf3.0 MB
- Download2025 TAFB Mechanical Standard_Signed.pdf.pdf1.3 MB
- Downloadufc_3_260_01_2019_c1.pdf.pdf50.0 MB
- DownloadPages from 910139.pdf.pdf1.8 MB
- DownloadSolicitation - FA813726R0043.pdf.pdf680 KB
- Download01 78 00.pdf.pdf1.4 MB
- Downloadafman40-201.pdf.pdf1.1 MB
- Download430515.pdf.pdf869 KB
- Download2025 TAFB Electrical Standards - Signed.pdf.pdf559 KB
- Download240176_ATT02_STATEMENT OF WORK_Admendment 2.pdf.pdf319 KB
- Download240176_ATT 10_Design Narrative.pdf.pdf3.9 MB
- Download007200_Attch7a_AF3952.pdf.pdf40 KB
- Download01 32 16.00 20.pdf.pdf28 KB
- Downloadafman48-148.pdf.pdf1.0 MB
- Download01 33 16.00 10.pdf.pdf86 KB
- Download240176_ATT09_SOW.pdf.pdf316 KB
- DownloadFIRE SUPPRESSION TANK FIRE ALARM AS-BUILT SHOP DRAWINGS.pdf.pdf1.0 MB
- DownloadHAZMAT Reporting at Tinker AFB FEB 2025.pdf.pdf23 KB
- DownloadWWYK143004_CU506.pdf.pdf420 KB
- DownloadSite Visit Meet-up Point.png.png2.0 MB
- Download690255.pdf.pdf474 KB
- DownloadCombined As-Built Record Dwgs.pdf.pdf11.9 MB
- Download551213.pdf.pdf121 KB
- Download00 72 00.pdf.pdf5.3 MB
- Download730155.pdf.pdf355 KB
- Download920203.pdf.pdf6.8 MB
- Downloadtinkerafb_INRMP_App E.pdf.pdf225 KB
- Download00 71 00.pdf.pdf1.5 MB
- Download007100_Attch1_Airfield Construction Waiver.pdf.pdf192 KB
- DownloadTinker General Requirements Specifications_Nov 2022_Change Log.pdf.pdf94 KB
- Download240176_ATT 11_Submittal Register.pdf.pdf142 KB
- Download007200_Attch9_EMS Awareness Training.pdf.pdf86 KB
- DownloadWWYK143004_CU512.pdf.pdf358 KB
- Download02122M-EQ01.pdf 2024.pdf.pdf1.4 MB
- DownloadSOW Att 02c_Controlled Area Training - Certificate.pdf.pdf467 KB
- Download240176_Amendment 1 Drawings.pdf.pdf3.3 MB
- DownloadWWYK143004_CU509.pdf.pdf358 KB
- Downloaddafi91-202.pdf.pdf1.9 MB
- Download581021.pdf.pdf83 KB
- Download01 45 00.00 10.pdf.pdf36 KB
- Download610080.pdf.pdf473 KB
- Downloadafi48-104.pdf.pdf317 KB
- DownloadIndustrial Waste Distribution East of 18_36.pdf.pdf898 KB
- DownloadWWYK143004_CU510.pdf.pdf282 KB
- Download240176_ATT12_ Drawings.pdf.pdf3.0 MB
- Download2023 TAFB Fire Protection Standard.pdf.pdf379 KB
- DownloadWage Determination - 18 May 2026.pdf.pdf143 KB
- Downloadufc_3_260_04_2018.pdf.pdf2.3 MB
- DownloadWWYK921223.pdf.pdf1.0 MB
- Downloadufc_3_601_02_2021.pdf.pdf2.1 MB
- Download240176_ATT10_Design_Narrative.pdf.pdf3.9 MB
- Download1994_IndWaste.pdf.pdf1.2 MB
- Downloaddafman91-203.pdf.pdf3.8 MB
- Download2020 TAFB Facility Standard.pdf.pdf5.8 MB
- DownloadTAFB_SOP_outages_v2.pdf.pdf473 KB
- Download00 80 05.pdf.pdf10 KB
- Downloadtinkerafb_HWMP.pdf.pdf1016 KB
- Download02119A-FP01-Model.pdf.pdf90 KB
- Downloadufc_3_600_01_2016_c6.pdf.pdf9.9 MB
- Download01 50 00.pdf.pdf300 KB
- Download01 42 00.pdf.pdf10 KB
- DownloadERDCITL_TR12-1_r2.pdf.pdf3.4 MB
- Downloadafi91-202_afmcsup.pdf.pdf2.7 MB
- Downloadtinkerafbi13-204.pdf.pdf1.8 MB
Contacts
Similar contracts
- Total Maintenance for Critical Facilities at USAG Humphreys and Camp YonginDue Oct 2, 2026
- HST Roof Safety Construction ProjectDistrict of ColumbiaDue Oct 19, 2026
- Space Port of the Future Infrastructure (SPOTFi) Campus (AM01)Due Oct 9, 2026
- Multiple Award IDIQ Contract for Design Build & General Construction Services - New York & New JerseyNew YorkDue Oct 28, 2026
- FCKY UEPH Barracks CM@RiskKentuckyDue Oct 13, 2026
- Industry Days - West Haven, Ct & Togus, MeDue Oct 23, 2026