Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501

DEPT OF DEFENSE · Oklahoma
Response deadline
Aug 31, 2026
Closed
Date posted
Aug 10, 2026

Description

THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY UPDATE 04 - 10 AUGUST 2026 1) A revised Statement of Work labeled "240176_ATT02_STATEMENT OF WORK_Admendment 2" has been posted to the attachments sections of this solicitation 2) Revised drawings labeled "240176_ATT03_Amendment 2_Drawings" have been posted to the attachments section of this solicitation 3) A revised Design Narrative labeled "240176_ATT01_Design Narrative_Amendment 2" has been posted to the attachments secitons of this soliciation 4) Proposals are due 31 August 2026 @ 1400 (2:00 PM) CST 5) Proposals are to be sent to SSgt. Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY UPDATE 03 - 31 JULY 2026 1) Prebid RFI Responses have been posted to the attachments section and are labeled: "WWYK240176 Pre Bid RFI's" 2) Proposals are due 31 August 2026 @ 1400 (2:00 pm) CST. 3) Proposals are to be sent to SSgt. Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY UPDATE 02 - 23 JULY 2026 1) The Site Visit Sign In sheet has been posted in the attachments section 2) RFI responses from the previous solicitation have been posted in the attachments section 3) RFI's are due 27 July 2026 @ 1400 (2:00 pm). Please send RFI's to SSgt Isaac Demmers at isaac.demmers@us.af.mil THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY UPDATE 01 - 22 JULY 2026 1) The site visit was conducted on 21 July 2026 2) RFI's are due 27 July 2026 @ 1400 (2:00 pm). Please send RFI's to SSgt Isaac Demmers at isaac.demmers@us.af.mil. 3) The site visit sign in sheet will be posted on 23 July 2026 THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY Project Title: WWYK240176 - REPLACE INDUSTRIAL WASTE LIFT STATIONS 6N & 6S, B62501 Rehabilitate or replace LS-6N&S (B2122). Consider future flows. Consider if LS-6N&S can be combined into a single LS. Consider if wet well structure can be combined, reused, and/or rehabilitated with a coating system or liner. The work to be performed under the terms of this order consists of furnishing all design/engineering services, material, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the demo and replacement of the industrial waste lift stations (IWLS) 6N and 6S at Tinker Air Force Base (AFB), Oklahoma. Project specific documents are attached to this posting. If you experience any difficulty at receiving or accessing the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission sent to your email. In the email, please provide email addresses for Prime Contractors points of contact ONLY, to have a DoD Safe link sent to. Do not include any sub-contractor email addresses. THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access. After receipt of your RSVP and EAL if required, Initial Site Visit is set for Tuesday, 21 July, 2026 at 0900 (9:00 am). The meet up location for the site visit will be held near building 2122. Approximate coordinates are: 35°24'33.3"N 97°22'17.2"W. An attachment titled "Site Visit Meet-up Point" attached below gives the specific details and visual for the meet up point. You must attend the initial Site Vist for the project, to be considered eligible to propose. Please submit your RSVP to SSgt Isaac Demmers at "isaac.demmers@us.af.mil". THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY

Classifications

Documents (122)

  • WWYK143004_CU503.pdf
    .pdf367 KB
    Download
  • tinkerafbi21-100.pdf
    .pdf213 KB
    Download
  • EM_385-1-1.pdf
    .pdf10.1 MB
    Download
  • dafi13-213.pdf
    .pdf1.2 MB
    Download
  • 240176_ATT 11_Submittal Register.xlsx
    .xlsx20 KB
    Download
  • 240176_STATEMENT OF WORK-Amendment 1.pdf
    .pdf318 KB
    Download
  • 1993_IndWaste.pdf
    .pdf1.1 MB
    Download
  • 00 70 00.pdf
    .pdf897 KB
    Download
  • Industrial Waste Lines 1969.pdf
    .pdf9.4 MB
    Download
  • afman32-7003.pdf
    .pdf1.3 MB
    Download
  • WWYK143004_CU513.pdf
    .pdf344 KB
    Download
  • ERDCITL_TR12-6_r6.pdf
    .pdf1.5 MB
    Download
  • 480211.pdf
    .pdf445 KB
    Download
  • 240176_ATT 3_Green Procurement Statement.pdf
    .pdf278 KB
    Download
  • WWYK143004_CU514.pdf
    .pdf617 KB
    Download
  • dafi13-213_tinkerafbsup.pdf
    .pdf687 KB
    Download
  • 017800_Attch1_DD1354.pdf
    .pdf93 KB
    Download
  • WWYK143004_CU501.pdf
    .pdf473 KB
    Download
  • SOW Att 01_Appointment of Security Representative Template 496.docx
    .docx101 KB
    Download
  • tinkerafb_INRMP_App G.pdf
    .pdf4.6 MB
    Download
  • WWYK143004_CU504.pdf
    .pdf384 KB
    Download
  • 00 80 00.pdf
    .pdf8 KB
    Download
  • 01 78 23.pdf
    .pdf34 KB
    Download
  • 1995_IndWaste.pdf
    .pdf1.1 MB
    Download
  • 240176_ATT03_Amendment 2_Drawings.pdf
    .pdf5.3 MB
    Download
  • ufc_3_535_01_2017_c4.pdf
    .pdf19.8 MB
    Download
  • 240176_PRE-BID RFI RESPONSES - COR Signed.pdf
    .pdf876 KB
    Download
  • WWYK143004_CU511.pdf
    .pdf412 KB
    Download
  • 017800_Attch2_DD1354 Checklist.docx
    .docx44 KB
    Download
  • 01 33 00.pdf
    .pdf856 KB
    Download
  • tinkerafb_INRMP.pdf
    .pdf15.8 MB
    Download
  • 007200_Attch14_Information for New Boilers.pdf
    .pdf144 KB
    Download
  • FIRE SUPPRESSION GEODESIC SHOP DRAWINGS AS-BUILTS.pdf
    .pdf4.2 MB
    Download
  • 20010298.pdf
    .pdf893 KB
    Download
  • UMRL.pdf
    .pdf686 KB
    Download
  • WWYK143004_CU502.pdf
    .pdf716 KB
    Download
  • 240176_Site Visit Sign In.pdf
    .pdf3.8 MB
    Download
  • 20090026A.pdf
    .pdf212 KB
    Download
  • 240176_ROUND 3_PRE BID RFIs_For Signature 2 - COR Signed.pdf
    .pdf442 KB
    Download
  • B02119.txt
    .txt1 KB
    Download
  • SOW Att 02a_Controlled Area Training.pptx
    .pptx651 KB
    Download
  • WWYK143004_CU505.pdf
    .pdf574 KB
    Download
  • afman91-203_oc-alcsup.pdf
    .pdf389 KB
    Download
  • 007000_Attch1_TAFB Outage Request Form.pdf
    .pdf186 KB
    Download
  • 013300_Attch1_TAFBF3000.pdf
    .pdf234 KB
    Download
  • 240176_ATT 9_STATEMENT OF WORK.pdf
    .pdf316 KB
    Download
  • 531005.pdf
    .pdf155 KB
    Download
  • dafi21-101_afmcsup_afmcgm2023-01.pdf
    .pdf2.8 MB
    Download
  • 000_TABLE OF CONTENTS.pdf
    .pdf70 KB
    Download
  • 240176_ATT01_Design Narrative_Amendment 2.pdf
    .pdf342 KB
    Download
  • 710238.pdf
    .pdf1.1 MB
    Download
  • dodio-2000.16v1_afi10-245-o.pdf
    .pdf37 KB
    Download
  • 710237.pdf
    .pdf384 KB
    Download
  • 007200_Attch13_AF487.pdf
    .pdf1.4 MB
    Download
  • dafi21-101.pdf
    .pdf2.5 MB
    Download
  • WWYK143004_CU507.pdf
    .pdf728 KB
    Download
  • WWYK143004_CU500.pdf
    .pdf417 KB
    Download
  • WWYK143004_CU508.pdf
    .pdf444 KB
    Download
  • 240176_Final_ Plan Set.pdf
    .pdf3.0 MB
    Download
  • 2025 TAFB Mechanical Standard_Signed.pdf
    .pdf1.3 MB
    Download
  • ufc_3_260_01_2019_c1.pdf
    .pdf50.0 MB
    Download
  • Pages from 910139.pdf
    .pdf1.8 MB
    Download
  • Solicitation - FA813726R0043.pdf
    .pdf680 KB
    Download
  • 01 78 00.pdf
    .pdf1.4 MB
    Download
  • afman40-201.pdf
    .pdf1.1 MB
    Download
  • 430515.pdf
    .pdf869 KB
    Download
  • 2025 TAFB Electrical Standards - Signed.pdf
    .pdf559 KB
    Download
  • 240176_ATT02_STATEMENT OF WORK_Admendment 2.pdf
    .pdf319 KB
    Download
  • 240176_ATT 10_Design Narrative.pdf
    .pdf3.9 MB
    Download
  • 007200_Attch7a_AF3952.pdf
    .pdf40 KB
    Download
  • 01 32 16.00 20.pdf
    .pdf28 KB
    Download
  • afman48-148.pdf
    .pdf1.0 MB
    Download
  • 01 33 16.00 10.pdf
    .pdf86 KB
    Download
  • 240176_ATT09_SOW.pdf
    .pdf316 KB
    Download
  • FIRE SUPPRESSION TANK FIRE ALARM AS-BUILT SHOP DRAWINGS.pdf
    .pdf1.0 MB
    Download
  • HAZMAT Reporting at Tinker AFB FEB 2025.pdf
    .pdf23 KB
    Download
  • WWYK143004_CU506.pdf
    .pdf420 KB
    Download
  • Site Visit Meet-up Point.png
    .png2.0 MB
    Download
  • 690255.pdf
    .pdf474 KB
    Download
  • Combined As-Built Record Dwgs.pdf
    .pdf11.9 MB
    Download
  • 551213.pdf
    .pdf121 KB
    Download
  • 00 72 00.pdf
    .pdf5.3 MB
    Download
  • 730155.pdf
    .pdf355 KB
    Download
  • 920203.pdf
    .pdf6.8 MB
    Download
  • tinkerafb_INRMP_App E.pdf
    .pdf225 KB
    Download
  • 00 71 00.pdf
    .pdf1.5 MB
    Download
  • 007100_Attch1_Airfield Construction Waiver.pdf
    .pdf192 KB
    Download
  • Tinker General Requirements Specifications_Nov 2022_Change Log.pdf
    .pdf94 KB
    Download
  • 240176_ATT 11_Submittal Register.pdf
    .pdf142 KB
    Download
  • 007200_Attch9_EMS Awareness Training.pdf
    .pdf86 KB
    Download
  • WWYK143004_CU512.pdf
    .pdf358 KB
    Download
  • 02122M-EQ01.pdf 2024.pdf
    .pdf1.4 MB
    Download
  • SOW Att 02c_Controlled Area Training - Certificate.pdf
    .pdf467 KB
    Download
  • 240176_Amendment 1 Drawings.pdf
    .pdf3.3 MB
    Download
  • WWYK143004_CU509.pdf
    .pdf358 KB
    Download
  • dafi91-202.pdf
    .pdf1.9 MB
    Download
  • 581021.pdf
    .pdf83 KB
    Download
  • 01 45 00.00 10.pdf
    .pdf36 KB
    Download
  • 610080.pdf
    .pdf473 KB
    Download
  • afi48-104.pdf
    .pdf317 KB
    Download
  • Industrial Waste Distribution East of 18_36.pdf
    .pdf898 KB
    Download
  • WWYK143004_CU510.pdf
    .pdf282 KB
    Download
  • 240176_ATT12_ Drawings.pdf
    .pdf3.0 MB
    Download
  • 2023 TAFB Fire Protection Standard.pdf
    .pdf379 KB
    Download
  • Wage Determination - 18 May 2026.pdf
    .pdf143 KB
    Download
  • ufc_3_260_04_2018.pdf
    .pdf2.3 MB
    Download
  • WWYK921223.pdf
    .pdf1.0 MB
    Download
  • ufc_3_601_02_2021.pdf
    .pdf2.1 MB
    Download
  • 240176_ATT10_Design_Narrative.pdf
    .pdf3.9 MB
    Download
  • 1994_IndWaste.pdf
    .pdf1.2 MB
    Download
  • dafman91-203.pdf
    .pdf3.8 MB
    Download
  • 2020 TAFB Facility Standard.pdf
    .pdf5.8 MB
    Download
  • TAFB_SOP_outages_v2.pdf
    .pdf473 KB
    Download
  • 00 80 05.pdf
    .pdf10 KB
    Download
  • tinkerafb_HWMP.pdf
    .pdf1016 KB
    Download
  • 02119A-FP01-Model.pdf
    .pdf90 KB
    Download
  • ufc_3_600_01_2016_c6.pdf
    .pdf9.9 MB
    Download
  • 01 50 00.pdf
    .pdf300 KB
    Download
  • 01 42 00.pdf
    .pdf10 KB
    Download
  • ERDCITL_TR12-1_r2.pdf
    .pdf3.4 MB
    Download
  • afi91-202_afmcsup.pdf
    .pdf2.7 MB
    Download
  • tinkerafbi13-204.pdf
    .pdf1.8 MB
    Download