Tinker AFB 2026 Multiple Award Construction Contract (MACC)
- Response deadline
- Sep 11, 2026 Due in 31 days
- Date posted
- Aug 11, 2026
- Source
- Open notice
Description
August 11 2026: 1. Please see amendment 0001 attached and an updated Section L dated 5 August 2026. 2. The government is accepting RFIs until 21 August at 3PM EDT. If you have already sent your RFIs to the POCs you do not have to resubmit them. 4 August 2026: Please see the attached RFP (FA8137-26-R-0040) and all attachments. --------------------------------------------------------------------------------------------------------------- THIS POSTING WILL SATISFY THE REQUIREMENT OF RFO 5.101, Presolicitation Multiple Award Construction Contract (MACC) for General Construction Services will accomplish a broad range of sustainment, maintenance, repair, alteration/renovation, and minor construction projects affecting real property facilities at Tinker Air Force Base, Oklahoma. The work performed will be complex in nature, require multiple construction trades, and may require engineering design performed by credentialed professionals. Project execution methods will fall into one of the following classifications. The execution method will be defined in the project documents for each Task Order (TO) under this Indefinite Delivery Indefinite Quanity (IDIQ) contract. Design Build will include the Contractor providing both the design and construction services for a project; during the Design-Build process, final design solutions are provided by the Contractor, not the Government. The Government will provide a Statement of Work (SOW), drawings, and other preliminary documents to establish requirements from the work to be completed. These documents will be equivalent to a schematic 15% or greater design. When awarded the TO for the project, the Contractor will complete the design to the 100% level to include drawings, specifications, design analysis/narrative, and other documentation as required by the Government. Construction with Limited Design method will include the Government providing the design and the Contractor will further develop portions as required and will provide construction services for the project. This method will be used for non-complex or repetitive work types of projects where design cost and effort is not warranted. The Government will provide the SOW, drawings, and other documents as necessary to establish requirements to complete the project. These documents will be equivalent to a design submittal 35% to 65%. When awarded the TO the Contractor will complete any additional design efforts required by the project and produce a set of working documents for use during construction. Construction only method will include the Government providing 100% design package, including the SOW, drawings, specification, and any other documents as necessary to establish requirements for the work to be accomplished. When awarded the TO the Contractor shall commence with construction in accordance with the design and contract requirements. The Contractor is required to furnish all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals necessary to provide a complete useable end product as specified in the TO/project documents. The North American Industry Classification System (NAICS) Code is 236210, Industrial Building Construction with a small business size standard of $45 million. The MACC will be executed for one base period of five (5) years with one option period of five (5) years. The Government will negotiate equitable adjustments resulting from change orders in the shortest practicable time. Approximately 120 days are required to definitize equitable adjustments associated with change orders for construction. The definitization of an equitable adjustment begins when the contracting officer receives an adequate change order definitization proposal and ends when the contracting officer executes a contractual action to definitize the change order. IMPORTANT NOTICE: Offerors are required to complete their registration in the System for Award Management (SAM) database via the website https://www.sam.gov. Offerors are strongly encouraged to review their informaiton in SAM to validate that it is current and up to date. Failure to do so could result in the offeror being ineligible for award of Department of War contracts IAW RFO 4.203-1 registered in SAM database. DISCLAIMER: The information being requested does not constitute a commitment on the part of the Government to award a contract, nor to pay for any costs incurred as a result of replying to this notice. This notice should not be construed as a commitment by the Government for any purpose.
Classifications
Documents (32)
- Downloaddodio-2000.16v1_afi10-245-o.pdf.pdf37 KB
- Download003 CDRL - TO Progress Mtg Signed.pdf.pdf144 KB
- DownloadAttachment 1 - Statement of Work Jun26.pdf.pdf1.0 MB
- DownloadAttachment_2__Section_L 5 Aug 26.pdf.pdf320 KB
- DownloadAppendix C UMRL.pdf.pdf686 KB
- Download004 CDRL Data Rights.pdf.pdf99 KB
- Downloadafi91-202_afmcsup.pdf.pdf2.7 MB
- DownloadAttachment_2b_Appendix_B_Work_Sample_Cover_Sheet4May26.docx.docx31 KB
- DownloadAttachment_2f_Appendix_F_MACC_FOCross_Reference_Matrix 4 May 26.xlsx.xlsx84 KB
- DownloadAttachment_3_Section_M_Evaluation_Criteria 29 July 26.pdf.pdf208 KB
- DownloadERDCITL_TR12-1_r2.pdf.pdf3.4 MB
- DownloadTAFB_SOP_outages_v2.pdf.pdf473 KB
- DownloadAttachment_2a_Appendix_A_Corporate_Relationships_and_Structures4May26.xlsx.xlsx15 KB
- DownloadAttachment_2e_Appendix_E_MACC_SBCross_Reference_Matrix 4 May 26.xlsx.xlsx88 KB
- DownloadERDCITL_TR12-6_r6.pdf.pdf1.5 MB
- DownloadTAFB Facility Standards.pdf.pdf10.1 MB
- Download002 CDRL - Quaterly Progress Mtg Signed.pdf.pdf144 KB
- Downloadtinkerafbi13-204.pdf.pdf1.8 MB
- DownloadB2 -TAFB Technical Requirements Div 02-48.pdf.pdf9.8 MB
- DownloadSolicitation Amendment - FA813726R00400001.pdf.pdf1.1 MB
- Downloadtinkerafb_INRMP_App E.pdf.pdf225 KB
- DownloadAppendix B1 TAFB General Requirements Div 00-01.pdf.pdf9.8 MB
- DownloadAttachment_2d_Appendix_D_MACC_FOSelf_Scoring_Matrix 06 May 26.xlsx.xlsx84 KB
- Downloadafi48-104.pdf.pdf317 KB
- Downloadtinkerafbi21-100.pdf.pdf213 KB
- Downloadtinkerafb_INRMP_App G.pdf.pdf4.6 MB
- DownloadAttachment_2c_Appendix_C_MACC_SBSelf_Scoring_Matrix 06 May 26.xlsx.xlsx82 KB
- DownloadSolicitation Amendment FA813726R00400001 SF 30.pdf.pdf382 KB
- DownloadTAFB Gen Specs Reference 1.pdf.pdf38.8 MB
- DownloadUFC Binder 1.pdf.pdf50.0 MB
- Download001 CDRL - Organization Chart Signed.pdf.pdf144 KB
- DownloadAppendix A - Abbreviations.pdf.pdf60 KB
Contacts
Similar contracts
- LCAAP Contaminated Waste Plant W519TC-26-R-ACWPMissouriDue Aug 25, 2026
- CONSTRUCT TOC PAD - ARLINGTON HEIGHTS IL - Pre-SolicitationDue Sep 9, 2026
- JM26 CNIC BLDG 1909 Kitchen Silica Dust Cleaning and Floor RepairDue Aug 24, 2026
- WWYK240052 Renovate Hallway, 1AB1-103C, 1AB1-108B, B3001OklahomaDue Sep 30, 2026
- Patch and Repaint of Corridor of Building 6010 (1st, 3rd, & 4th Floor)MarylandDue Aug 13, 2026
- LCAAP Contaminated Waste Plant W519TC-26-R-ACWPMissouriDue Aug 25, 2026