OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
- Response deadline
- Sep 10, 2026 Due in 17 days
- Date posted
- Aug 24, 2026
- Source
- Open notice
Description
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S. Fish and Wildlife Service (FWS) facility approximately 8 miles northwest of the Town of Tishomingo. The project will address deteriorated pavement for the entrance loop, adding a small parking area at the northeast corner of the entrance loop, and pavement of the entrance road and parking area south of HWY 7. The 3R project will provide new driving surface, entrance gates, culverts, Architectural Barriers Act (ABA) compliant parking spot, and ABA compliant curb ramp. SCOPE OF THE WORK: The project will consist of full depth reclamation of the existing roads asphalt to a depth of 6-in, paving 3-in of asphalt, super elevation correction, and culvert replacement. New parking areas will be constructed with new aggregate base and asphalt pavement. A concrete ABA compliant curb ramp and ABA compliant parking spot. Concrete aprons will be placed around existing structures to match existing. Two new gates at the entrances to the NFH will also be installed. Entrance roads and parking areas will be closed during construction. PRINCIPAL WORK ITEMS: 30402-5300 Full Depth Reclamation Method 2, 6-inch depth: 6,800 SQYD 40301-0100 Asphalt Concrete Pavement, 1,250 TON 20401-0000 Roadway Excavation, 400 CUYD ANTICIPATED SCHEDULE: Advertisement – September 2026 Award - November 2026 Construction – June 2027 through October 2027 ESTIMATED COST RANGE: Between $700,000 and $2,000,000
Classifications
Documents
No documents posted for this opportunity.
Contacts
Similar contracts
- Replace Foundation Concrete and Anchor Bolts, BAK-12 SystemCaliforniaDue Sep 8, 2026
- Z--GRSM ROAD STRIPINGDue Aug 28, 2026
- Airfield Repair Sources SoughtAl Jahrā’Due Aug 30, 2026
- Country Club west Stoplog RehabilitationTexasDue Sep 10, 2026
- COMPOUND PERIMETER PATH ASPHALT REPAIRBogotáDue Aug 27, 2026
- Whiteman AFB - FY27 Airfield PavementMissouriDue Aug 28, 2026