Civic AI
Civic AI
Procurement intelligence
SAM.govW912BV279A001
Open

FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, Oklahoma

DEPT OF DEFENSE · Oklahoma
Response deadline
Oct 13, 2026
Due in 11 days
Date posted
Oct 2, 2026

Description

The U.S. Army Corps of Engineers (USACE), Tulsa District is issuing this Request for Qualifications (RFQ) for the design and construction of the FY28 KC-46A Aircraft Beddown Infrastructure Program at Altus Air Force Base, Oklahoma using Progressive Design-Build under 10 USC 2808a Other Transaction Authority. The KC-46A Aircraft Beddown Infrastructure Program at Altus AFB, Oklahoma, will deliver comprehensive flight-line, industrial maintenance, and advanced aircrew flight simulator training facilities necessary to support the 97th Air Mobility Wing (97 AMW) - the Department of the Air Force’s sole formal training unit for heavy mobility aircraft. This $235M consolidated capital program will modernize the installation's infrastructure to replace Eisenhower-era KC-135 operations with the next-generation KC-46A Pegasus tanker while sustaining concurrent training and maintenance for its legacy fleets. The program will deliver three primary facility complexes along with associated airfield civil site infrastructure: KC-46A Aircraft Maintenance Hangar (General Maintenance) KC-46A Multipurpose Hangar (Corrosion Control & Open-Tank Fuel Cell Maintenance) KC-46A Simulator Facility Phase 4 (Flight Training Center Expansion) USACE will use a streamlined competitive selection process to select the most highly qualified design-build team:  Step 1 – Statement of Qualifications: Interested parties will submit a Statement of Qualifications. The Government intends to down-select up to three Design-Build Teams to proceed to Step 2.  Step 2 – Pitch Presentations: Selected Design-Build Teams will participate in pitch meetings. One firm will be selected as the Design-Build team for award of the initial design and preconstruction services with a modification for design completion and construction award.  The agreement will be awarded to the most qualified design-build team to provide design development, preconstruction services, and construction. Post-award Phase 1 of PDB includes design and pre-construction services and Post-award Phase 2 includes the final design and construction. The agreement will be Firm-Fixed-Price (FFP). The FFP for successive design and construction milestones will be agreed to as the design progresses and funds become available.

Classifications

Documents (3)

  • Attachment 1 - KC-46A Aircraft Beddown Infrastructure Program Request for Qualifications 10.2.26.pdf
    .pdf291 KBNot yet available
  • Attachment 2 - FY28 KC-46A Aircraft Beddown Instructure Program Requirements 10.2.26 - CLEAN.pdf
    .pdf233 KBNot yet available
  • RFQ No. W9124BV279A001 Altus AFB KC-46A Aircraft Beddown Infrastructure 10.2.26.pdf
    .pdf564 KBNot yet available

Contacts

Similar contracts

Explore more