Civic AI
Civic AI
Procurement intelligence
SAM.gov1305M226Q0038
Open

Transition Power Supply Installation IDIQ with the Radar Operations Center

COMMERCE, DEPARTMENT OF · OK
Response deadline
Jul 7, 2026
Closed
Date posted
Jun 22, 2026

Description

The Government is seeking a 5-year IDIQ for the following: Eaton 93PM UPS and maintenance bypass module (MBM) and Battery cabinet with batteries installed at sites specified in Table 3 of the SON (any associated installation travel costs must be built in to the per unit pricing). Eaton 93PM UPS and MBM sidecar and Battery cabinet with batteries installed at the sites prescribed in Table 3 of the SON (any associated installation travel costs must be built in to the per unit pricing). and; Eaton 93PM UPS and sidecar w/MBM and Battery cabinet WITHOUT batteries; shipped to the National Logistics Support Center. (NO INSTALLATION) Vendors are responsible for providing all information and documentation listed in Section L- Instructions, Conditions, and Notices to Bidders of attachment Sol_1305M226Q0038, including Volume I: Technical Compliance, Volume II: Installation Plan, Volume Ill: Past Performance, and Volume 4: Price. Evaluation information for those volumnes are provided in Section M - Evaluation Factors for Award. Failure to provide ALL required documents on time will result in submissions being deemed non responsive.

Classifications

Documents (8)

  • Past Performance Questionnaire (5).pdf
    .pdf259 KB
    Download
  • Past Performance Information Form (5).pdf
    .pdf349 KB
    Download
  • SON Final.docx (5).pdf
    .pdf433 KB
    Download
  • TPS Effectivity_All Sites (with SON) (2).pdf
    .pdf115 KB
    Download
  • Sol_1305M226Q0038 (1).pdf
    .pdf392 KB
    Download
  • Pricing_Schedule (4).xlsx
    .xlsx59 KB
    Download
  • JOFOC for combined synopsis (1)_Redacted (3).pdf
    .pdf433 KB
    Download
  • PROCUREMENT MEMORANDUM 2023-12 (5).docx
    .docx14 KB
    Download

Contacts

Explore more