TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
- Response deadline
- Jun 29, 2026 Closed
- Date posted
- Jun 2, 2026
- Source
- Open notice
Description
Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 02 Jun 2026 Description of update>>> Uploaded 190023 Renovate Restrooms B117 RFIs_ FINAL_COR_Signed Proposals due 29 Jun 2026 Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. ========================================================================================== Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 28 May 2026 Description of update>>> Uploaded Model.zip file containg as-builts and TAFB_Tech_Reqs (Div 02-48).zip. Contact the CO or CS listed in contact information if you are not able to access. Proposals due 29 Jun 2026 Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. ========================================================================================== Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 22 May 2026 Description of update>>> Uploaded TAFB General Requirements (Div 00-01) Proposals due 29 Jun 2026 Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. ========================================================================================== Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. Updated 21 May 2026 Description of update>>> Uploaded Initial Site Visit WWYK190023 and WWYK20190023_REV02_19MAY2026 Drawings. After the site visit, the Fire Department advised they would like an inswing door changed to outswing to minimize response times. Attached are the amended drawings. The only change is the door swing. No change in materials. Proposals due 29 Jun 2026 Only the MAC BOA Holder GCs that attended Site Visit on 14 May 2026 will be able to continue forward toward the award. ========================================================================================== This posting is for Tinker AFB - MAC BOA Holders ONLY. Project Solicitation Number: FA813726R0030 Project Title: WWYK190023 – Renovate Restrooms, B117 Project Location: Tinker AFB - B117 Renovate men’s and women’s restrooms at B117 via Design-Bid-Build contract. This involved complete demolition and replacement of all the existing plumbing fixtures, domestic piping to iso valves, and sanitary sewer in both the men’s and women’s restrooms. The project is restricted to SB MAC BOA holders only. Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses. This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated. Initial Site Visit is set for May 14, 2026 – 1:30 PM – B117 You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.
Classifications
- NAICS236220
- PSCZ2AZ
Documents (28)
- Download01 78 23.pdf.pdf34 KB
- Download00 72 00.pdf.pdf5.3 MB
- DownloadSection L - Instructions to Offerors.pdf.pdf162 KB
- Download01 32 16.00 20.pdf.pdf28 KB
- DownloadEAL List - BLANK to Contractors WWYK190023.xlsx.xlsx62 KB
- DownloadSolicitation - FA813726R0030.pdf.pdf640 KB
- Download01 33 00.pdf.pdf856 KB
- DownloadSection M - Evaluation Factors for Award.pdf.pdf186 KB
- Download01 78 00.pdf.pdf1.4 MB
- DownloadModel.zip.zip50.0 MB
- DownloadTAFB_Tech_Reqs (Div 02-48).zip.zip43 KB
- Download01 33 16.00 10.pdf.pdf86 KB
- DownloadTinker General Requirements Specifications_Nov 2022_Change Log.pdf.pdf94 KB
- DownloadInitial Site Visit WWYK190023.pdf.pdf165 KB
- Download00 80 05.pdf.pdf10 KB
- Download01 50 00.pdf.pdf300 KB
- Download01 45 00.00 10.pdf.pdf36 KB
- DownloadWWYK20190023_REV02_19MAY2026.pdf.pdf10.9 MB
- Download01 42 00.pdf.pdf10 KB
- Download00 71 00.pdf.pdf1.5 MB
- Download190023 Renovate Restrooms B117 RFIs_FINAL_COR_Signed.pdf.pdf250 KB
- Download000_TABLE OF CONTENTS.pdf.pdf70 KB
- DownloadAtt10_190023_SOW.pdf.pdf291 KB
- Download00 70 00.pdf.pdf897 KB
- DownloadAtt12_190023_Drawings_Final.pdf.pdf10.8 MB
- Download00 80 00.pdf.pdf8 KB
- DownloadAtt11_190023_Submittal Register_Final.pdf.pdf309 KB
- DownloadWage Determination.pdf.pdf241 KB
Contacts
- Stephen Palmerstephen.palmer@us.af.mil4057394182
- Eric Owens