Civic AI
Civic AI
Procurement intelligence
ok_chickasaw27509
Open

Door installation at Tishomingo Event Center Green

Response deadline
Jul 30, 2026
Due in 2 days
Date posted
Jul 28, 2026

Description

Vendor will need to Supply all material required to frame current opening to fit 3080 solid core door. Metal framing 3-5/8"X12' 20 GA studs. Insulation Rock wool sound batting in wall. 4'x8'x5/8" Gypsum board. Door - 3080 Ravine Rift Cut White Oak with frame Texture and paint to match existing Install transition 36"x4" Black Aluminum

Documents

No documents posted for this opportunity.

Contacts

Similar contracts

Explore more