DISA Global COLUMBUS FURNITURE Upgrade
- Response deadline
- Aug 19, 2026 Due in 6 days
- Date posted
- Aug 13, 2026
- Source
- Open notice
Description
Amendment 02 8/13/26, RFP amended to revise Clause FAR 52.212-2, clarify attachment 6a, attachment 3 EPL, post all Q&A recieved and post site survey results/notes Amendment 01 7/31/2026. RFP amended to adjust Clause FAR 52.212-2 and chair QTY on PWS, update EPL attachment chair QTY, update Attachment 6a Pre-Proposal Site Visit instructions Q&A due date The successful vender will remove all existing furniture designated on construction drawings and purchase and install new furniture. Installation shall include the reconnecting the furniture to an existing electrical grid and cable network. The installation we be completed as shown on the proposed concept Plans (Attachment A - Furniture Layout). This contract will have an option in and above the base bid to include carpeting of the project area and receipt of 85 office chairs.
Classifications
Documents (16)
- Attachment 5b_Plans and Specifications (Attachment A on PWS).pdf.pdf405 KBNot yet available
- Attachment 5c_Plans and Specifications(Attachment B WS14 on PWS).pdf.pdf782 KBNot yet available
- Attachment 5d_Plans and Specifications (Attachment C WS4 on PWS.pdf.pdf402 KBNot yet available
- Attachment 2_QASP_Columbus Furniture.docx.docx49 KBNot yet available
- Attachment 5a_Plans and Specifications.pdf.pdf1.8 MBNot yet available
- Attachment 4_Provisions Clauses.docx.docx73 KBNot yet available
- Attachment 6b_VAR info.pdf.pdf153 KBNot yet available
- HC102826R0053 AMD 01.pdf.pdf465 KBNot yet available
- 832674621 Site Survey Notes.docx.docx24 KBNot yet available
- HC102826R0053 Furniture upgrade.pdf.pdf1.2 MBNot yet available
- Attachment 6c_DSCC Map to Bldg.pdf.pdf968 KBNot yet available
- Attachement 3 _EPL revised 13 AUG.xlsx.xlsx32 KBNot yet available
- Attachment 1 Performance Work Statement.docx.docx77 KBNot yet available
- Attachment 6a_Pre-Proposal Site Visit Instructions31JUL.docx.docx61 KBNot yet available
- 832674621 Columbus furniture upgrade QA Full listing 13 Aug v2.docx.docx31 KBNot yet available
- HC102826R0053 AMD 02.pdf.pdf134 KBNot yet available
Contacts
Similar contracts
- Ancillary Furniture, Project-Facility 10867OhioDue Sep 14, 2026
- 15th MXS Transient Alert Office FurnitureHawaiiDue Aug 15, 2026
- F30001 Workstation Expansion MAX Out 2026TP096OhioDue Aug 31, 2026
- F20840 OBL, PH2 Office Furniture 2026TP112OhioDue Aug 28, 2026
- 149 IS Bldg. 4750 FurnitureCaliforniaDue Aug 17, 2026
- NASIC Facility Performance Task SeatingOhioDue Sep 14, 2026