DISA Global COLUMBUS FURNITURE Upgrade
- Response deadline
- Aug 26, 2026 Due in 8 days
- Date posted
- Aug 18, 2026
- Source
- Open notice
Description
Amendment 03 8/18/26, Revise/correct the EPL Attachment 3 Revise Q&A doc Update PWS Attachment 1 to revise verbiage on part 10 Period of Performance Extend the due date of proposals to Aug 26, 2026 2:00 pm CDT A conformed copy of the solicitation is also placed in the attachments that contains all amenments for reference. Amendment 02 8/13/26, RFP amended to revise Clause FAR 52.212-2, clarify attachment 6a, attachment 3 EPL, post all Q&A recieved and post site survey results/notes Amendment 01 7/31/2026. RFP amended to adjust Clause FAR 52.212-2 and chair QTY on PWS, update EPL attachment chair QTY, update Attachment 6a Pre-Proposal Site Visit instructions Q&A due date The successful vender will remove all existing furniture designated on construction drawings and purchase and install new furniture. Installation shall include the reconnecting the furniture to an existing electrical grid and cable network. The installation we be completed as shown on the proposed concept Plans (Attachment A - Furniture Layout). This contract will have an option in and above the base bid to include carpeting of the project area and receipt of 85 office chairs.
Classifications
Documents (18)
- HC102826R0053 AMD 03.pdf.pdf353 KBNot yet available
- Attachment 5b_Plans and Specifications (Attachment A on PWS).pdf.pdf405 KBNot yet available
- Attachment 5c_Plans and Specifications(Attachment B WS14 on PWS).pdf.pdf782 KBNot yet available
- Attachment 5d_Plans and Specifications (Attachment C WS4 on PWS.pdf.pdf402 KBNot yet available
- Attachment 2_QASP_Columbus Furniture.docx.docx49 KBNot yet available
- Attachment 5a_Plans and Specifications.pdf.pdf1.8 MBNot yet available
- Attachment 4_Provisions Clauses.docx.docx73 KBNot yet available
- Attachment 6b_VAR info.pdf.pdf153 KBNot yet available
- HC102826R0053 AMD 01.pdf.pdf465 KBNot yet available
- HC102826R0053 Conformed copy.docx.docx168 KBNot yet available
- Attachment 1 Performance Work Statement 18 Aug.docx.docx74 KBNot yet available
- Attachement 3 _EPL revised 18 AUG.xlsx.xlsx32 KBNot yet available
- 832674621 Site Survey Notes.docx.docx24 KBNot yet available
- HC102826R0053 Furniture upgrade.pdf.pdf1.2 MBNot yet available
- Attachment 6c_DSCC Map to Bldg.pdf.pdf968 KBNot yet available
- Attachment 6a_Pre-Proposal Site Visit Instructions31JUL.docx.docx61 KBNot yet available
- 832674621 Columbus furniture upgrade QA Full listing 18 Aug.docx.docx35 KBNot yet available
- HC102826R0053 AMD 02.pdf.pdf134 KBNot yet available
Contacts
Similar contracts
- Mobile Aisle Shelving SystemColoradoDue Aug 25, 2026
- RHTS 48 in x 24 in Office DesksFloridaDue Aug 25, 2026
- INTENT TO SOLE SOURCE: OWF Building 20015 Additional Stack PanelsOhioDue Aug 24, 2026
- ISRG Bldg. 302 FurnitureUtahDue Aug 24, 2026
- FY26 INOC Furniture and Equipment Purchases Robins AFBGeorgiaDue Aug 21, 2026
- SFS BDOC DesksOhioDue Aug 24, 2026