Civic AI
Civic AI
Procurement intelligence
SAM.govW9136426P0000040397
Open

CJAG Power Distribution

Response deadline
Sep 22, 2026
Due in 13 days
Date posted
Sep 8, 2026

Description

The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to construct the CJAG Load Line 6 Electrical System. The requirement includes construction of approximately 1,400 linear feet of underground medium-voltage electrical service terminating at a new pad-mounted transformer at the Load Line 6 area of Camp James A. Garfield Joint Training Center. The contractor shall perform all work in accordance with Attachment 1, including all requirements for utility coordination, route surveying, underground utility location, trenching, conduit installation, concrete encasement, backfill and compaction, cable installation, transformer installation, grounding, testing, energization, restoration, quality control, safety, security, and required deliverables. Site Visits are encouraged, call 1SG Brian Persing 330-984-8130 or CW2 Grant Stoner 614-336-6580. Do not contact these individuals for any reason other than coordinating site visit.

Classifications

Documents (2)

  • Combined Synopsis Solicitation_Power Distribution.docx
    .docx31 KBNot yet available
  • PWS_Electrical Installation_V2.docx
    .docx62 KBNot yet available

Contacts

Similar contracts

Explore more