CJAG Power Distribution
- Response deadline
- Sep 22, 2026 Due in 13 days
- Date posted
- Sep 8, 2026
- Source
- Open notice
Description
The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to construct the CJAG Load Line 6 Electrical System. The requirement includes construction of approximately 1,400 linear feet of underground medium-voltage electrical service terminating at a new pad-mounted transformer at the Load Line 6 area of Camp James A. Garfield Joint Training Center. The contractor shall perform all work in accordance with Attachment 1, including all requirements for utility coordination, route surveying, underground utility location, trenching, conduit installation, concrete encasement, backfill and compaction, cable installation, transformer installation, grounding, testing, energization, restoration, quality control, safety, security, and required deliverables. Site Visits are encouraged, call 1SG Brian Persing 330-984-8130 or CW2 Grant Stoner 614-336-6580. Do not contact these individuals for any reason other than coordinating site visit.
Classifications
Documents (2)
- Combined Synopsis Solicitation_Power Distribution.docx.docx31 KBNot yet available
- PWS_Electrical Installation_V2.docx.docx62 KBNot yet available
Contacts
Similar contracts
- Fiber Optic Cabling & InstallationDue Sep 10, 2026
- Sources Sought Announcement / Industry Day for Sentinel Utility Corridor at Malmstrom Air Force Base, MontanaMontanaDue Sep 24, 2026
- Special Notice, 537-24-500, Intent to Sole-SourceIllinoisDue Sep 18, 2026
- Notice of Intent - ACRx Antenna Installation - Wells Fargo CenterCaliforniaDue Sep 10, 2026
- Fiber Optic Cabling & InstallationDue Sep 10, 2026
- Philippines TS - Antenna Maintenance SupportTarlacDue Sep 11, 2026