SAM.gov36C25026B0033_1
Open
Y1AB--Stabilize/Improve Building 120 - 552-21-102
- Response deadline
- Jul 15, 2026 Closed
- Date posted
- May 22, 2026
- Source
- Open notice
Description
Project 552-- Stabilize/Improve Building 120 This project will construct primarily offices, administrative space, replace critical infrastructure items, address structural deficiences, and update systems deemed necessary for building areas to become active and functional.
Classifications
Documents (6)
- DownloadWage Determination OH20260093 5.18.2026.pdf.pdf1.8 MB
- DownloadJA OVER SAT - 552-21-102 Fire Alarm Panel_Redacted.pdf.pdf349 KB
- Download552-21-102 Putnam Library B120 - revised 100 Specifications.pdf.pdf20.6 MB
- DownloadJA OVER SAT - 552-21-102 HVAC Controls_Redacted.pdf.pdf253 KB
- Download552-21-102 Putnam Library B120 - revised 100 Drawings.pdf.pdf50.0 MB
- Download36C25026B0033_1.pdf.pdf808 KB
Contacts
- Contracting Officer
Similar contracts
- Repair Outdoor Switchgear Cabinets, Beacon Hill, S-1459 at USAG HumphreysDue Sep 10, 2026
- Vault Door Replacement, Building 4215, 2DLAADNorth CarolinaDue Aug 25, 2026
- BUILDING LF-18 JFK RESTROOMS RENOVATIONDue Aug 31, 2026
- Misawa AB - Membrane Storage Shelters - Design-BuildAomoriDue Sep 11, 2026
- GAOA High Sierra Ranger Station Upgrades, Sierra National ForestCaliforniaDue Sep 23, 2026
- Building 36000 2nd Floor Reconfiguration to Conference SpaceTexasDue Sep 3, 2026