SAM.gov32
Open
Fuze Assembly
DEPT OF DEFENSE · OH
- Response deadline
- —
- Date posted
- Jun 3, 2026
- Source
- Open notice
Description
AF 1067 was signed in 2015 confirming the need for a replacement to the Air Launch Cruise Missile's (ALCM) Imppact Sensor, also know as the Fuze Assembly. The Fuze Assembly has three seperate sensors located at strategic points within the ALCM. These sensors provide an output signal to the Warhead Arming Device. Mechanically, the Fuze assembly is a G-force operated switch. the effort will be a follow on contract to produce the required Fuzes needed to sustain ALCM past 2030.
Classifications
Documents (1)
- DownloadFuze JA AFNWC Redacted for Legal Review_Redacted.pdf.pdf1.3 MB
Contacts
- devin.mclelland@us.af.mil4057398851
Similar contracts
- Heater, Thermal ReleaseDue Nov 16, 2026
- Converter, Wave FormDue Nov 16, 2026
- Orion Crew Survival Systems Suit (OCSS) Intent to Sole SourceTexas
- Heater, Thermal ReleaseDue Nov 16, 2026
- Support, Guided MissileDue Nov 12, 2026
- Bearing HalfDue Nov 10, 2026