oh_dotc:260389
Open
Elm St Muni-Bridge (Butler) — BRIDGE REPLACEMENT (1 BRIDGE)
- Response deadline
- Aug 27, 2026 Due in 12 days
- Date posted
- Jul 11, 2026
- Source
- Open notice
Description
BRIDGE REPLACEMENT (1 BRIDGE) Route/Section: Elm St Muni-Bridge (Butler) District: 3 PID #: 120583
Documents (1)
- 260389-planholders.txttext/plain615 BNot yet available
Similar contracts
- SR 7-32.95 — SLIDE REPAIROHDue Aug 27, 2026
- US 33-15.66 — FOUR LANE RESURFACINGOHDue Aug 27, 2026
- SR 66-00.00 — TWO LANE RESURFACINGOHDue Aug 27, 2026
- East 66th Street TLCI — MINOR RECONSTRUCTIONOHDue Aug 27, 2026
- SR 125-14.08 — SIDEWALKOHDue Aug 27, 2026
- IR 75-06.94 Slide Repair — SLIDE REPAIROHDue Aug 27, 2026