oh_dotr:2071
Open
City of Steubenville (JEF- John Scott Connector Reconst)
- Response deadline
- Aug 26, 2026 Due in 26 days
- Date posted
- Jul 31, 2026
- Source
- Open notice
Description
File: JEF- John Scott Connector Reconst.pdf
Documents (1)
- JEF- John Scott Connector Reconst.pdfapplication/pdf241 KBNot yet available
Similar contracts
- SR 7-32.95 — SLIDE REPAIROHDue Aug 27, 2026
- SR 241-16.86 (PART 1 AND PART 2) — MINOR RECONSTRUCTIONOHDue Aug 13, 2026
- US 6/SR 611-06.86/VAR — BRIDGE REPAIROHDue Aug 13, 2026
- SR 148-03.12 — BRIDGE REPAIROHDue Aug 13, 2026
- IR 75-06.94 Slide Repair — SLIDE REPAIROHDue Aug 27, 2026
- SR 17-13.50 Replace — BRIDGE REPLACEMENT (1 BRIDGE)OHDue Aug 13, 2026