SAM.govW9123726QA064
Open
Office Roof Replacement Deer Creek Lake
- Response deadline
- Aug 3, 2026 Closed
- Date posted
- Jul 24, 2026
- Source
- Open notice
Description
This contract is for the removal of the existing Duro-Last roofing system. The Contractor shall supply and install a new, complete membrane roofing system, providing all necessary components and materials to ensure a watertight, warranted system. The new roofing system to be warranted (20-year minimum), installed with quality craftsmanship, and free of leaks at the time of acceptance by the Government.
Classifications
Documents (6)
- A.02.16 SOW INSTRUCTIONS.docx.docx3.5 MBNot yet available
- attachmentNot yet available
- A.03.09 Deer Creek Lake Office Roof Replacement Roof Diagram Labeled.pdf.pdf643 KBNot yet available
- B.04.20 Davis Bacon Wage Determination.pdf.pdf65 KBNot yet available
- B.08.03 W9123726QA0640001.pdf.pdf6.2 MBNot yet available
- B.08.03 W9123726QA0640001 SF 30.pdf.pdf3.8 MBNot yet available
Contacts
Similar contracts
- Commercial Roof Replacement (Fort Worth, TX)TexasDue Sep 30, 2026
- Replace Roof and Hatches, ITO ATCT, Hilo, HawaiiHawaiiDue Oct 16, 2026
- Disa Fy26 Roof Repairs at Fort Meade, MarylandDue Oct 9, 2026
- Proj. 561A4-26-501 Replace Roof Building 143 at VA NJ Lyons Design-Build
- USDA-ARS Tifton Roofing RemodelGeorgiaDue Sep 27, 2026
- Dworshak Powerhouse Roof ReplacementIdahoDue Oct 16, 2026