SAM.govIFB-36C77626B0025
Open
Z2DA--FY26 EHRM 620A4-22-700 EHRM Infrastructure Upgrades Construction Castle Point VA Medical Center; Wappinger Falls NY
VETERANS AFFAIRS, DEPARTMENT OF · NY
- Response deadline
- Jul 29, 2026 Due in 12 days
- Date posted
- Jul 8, 2026
- Source
- Open notice
Description
7-8-2026 - Amendment 2 - Extend the bid due date to 7/29 and add clause 52.212-4 6-15-2026 - Amendment 1 - Upload site visit sign-in sheet, and add VAAR Clause 852.219-73. In accordance with 38 U.S.C. § 8127 (Public Law 109-461), this project is a competitive Service-Disabled Veteran - Owned Small Business (SDVOSB) Set-Aside. The contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall do all things necessary that will result in the completion of Project 620A4-22-700 EHRM Infrastructure Upgrades construction project, in accordance with the attached Specifications and Drawings.
Classifications
Documents (26)
- Site visit sign-in sheet - Castle Point EHRM.pdf.pdf393 KBNot yet available
- Attachment 20 - Limitations on Subcontracting - Construction.docx.docx25 KBNot yet available
- Attachment 1 - SPECS - 260311 100pc CD2 R2 SPECS Combined 620A4 22 700.pdf.pdf50.0 MBNot yet available
- IFB - 36C77626B0025.pdf.pdf826 KBNot yet available
- Attachment 8 - Appendices UTL Locate 620A4-22-700.pdf.pdf15.0 MBNot yet available
- Attachment 17 - V-SURV-SUAS-SHEET 4.pdf.pdf1.2 MBNot yet available
- Attachment 18 - Additional Security Badging Requirements rev 2.pdf.pdf88 KBNot yet available
- Attachment 9 - DWGS Combined 1 of 5 620A4 22 700.pdf.pdf50.0 MBNot yet available
- Attachment 10 - DWGS Combined 2 of 5 620A4 22 700.pdf.pdf50.0 MBNot yet available
- Amendment 1 - 36C77626B0025 0001.pdf.pdf308 KBNot yet available
- Attachment 7 - Appendices TR Master List 620A4-22-700.pdf.pdf493 KBNot yet available
- Attachment 11 - DWGS Combined 3 of 5 620A4 22 700.pdf.pdf50.0 MBNot yet available
- Attachment 22 - RFI TRACKING SHEET - SOLICITATION 36C77626B0025 - Castle Point.xlsx.xlsx13 KBNot yet available
- Attachment 16 - V-SURV-SUAS-SHEET 3.pdf.pdf1.3 MBNot yet available
- Attachment 21 - Site visit instructions.pdf.pdf130 KBNot yet available
- Attachment 15 - V-SURV-SUAS-SHEET 2.pdf.pdf1014 KBNot yet available
- Attachment 12 - DWGS Combined 4 of 5 620A4 22 700.pdf.pdf50.0 MBNot yet available
- Attachment 5 - Appendices Geotech -620A4-22-700.pdf.pdf3.6 MBNot yet available
- Amendment 2 - 36C77626B0025 0002.pdf.pdf253 KBNot yet available
- Attachment 6 - Appendices Mech Variance Req 620A4-22-700.pdf.pdf1.7 MBNot yet available
- Attachment 19 - Wage rates Dutchess Co NY 5-18-2026.pdf.pdf814 KBNot yet available
- Attachment 4 - Appendices EnviroSurvey 620A4-22-700.pdf.pdf34.1 MBNot yet available
- Attachment 14 - V-SURV-SUAS-SHEET 1.pdf.pdf1.3 MBNot yet available
- Attachment 3 - Appendices ArchVarianceReq-620A4-22-700.pdf.pdf6.7 MBNot yet available
- Attachment 2 - BOD - 251107 100pc CD2 BOD 620A4 22 700r1.pdf.pdf2.7 MBNot yet available
- Attachment 13 - DWGS Combined 5 of 5 620A4 22 700.pdf.pdf42.2 MBNot yet available
Contacts
- Bridget May
- Jason Phillip