Civic AI
Civic AI
Procurement intelligence
SAM.gov36C77626B0024
Open

Z1DA--Upgrade Chiller Plant Construction Northport - Project 632-25-101

VETERANS AFFAIRS, DEPARTMENT OF · NY
Response deadline
Aug 18, 2026
Due in 31 days
Date posted
Jul 7, 2026

Description

Work includes general construction and alterations, of the existing chiller plant and includes the necessary removal of existing building components, systems, construction and installation of certain other items. The project will be constructed in two phases. Phase 1 work shall be completed and fully operational, supporting the medical facility, before a notice to proceed with phase 2 work will be issued. The project includes the installation and maintenance of a temporary chiller plant to support the Medical Facility during construction. All temporary installations shall remain in service until the end of the project’s startup of the new chiller plant and final acceptance.

Classifications

Documents (11)

  • ATTACHMENT 6 - Pre-Construction Risk Assessment.pdf
    .pdf2.0 MB
    Download
  • ATTACHMENT 7 - Infection Control Risk Assessment.pdf
    .pdf3.3 MB
    Download
  • ATTACHMENT 10 - Site Visit Instructions.pdf
    .pdf3.8 MB
    Download
  • ATTACHMENT 3 - Drawings.pdf
    .pdf50.0 MB
    Download
  • 36C77626B0024 - 7-7-26.pdf
    .pdf885 KB
    Download
  • ATTACHMENT 2 - Specifications.pdf
    .pdf7.8 MB
    Download
  • ATTACHMENT 8 - Limitations on Subcontracting - Construction.docx
    .docx18 KB
    Download
  • ATTACHMENT 9 - Construction Wage Rates - Suffolk 5-18-26.pdf
    .pdf83 KB
    Download
  • ATTACHMENT 4 - Existing Facility Drawings.pdf
    .pdf3.4 MB
    Download
  • ATTACHMENT 1 - SOW - Upgrade Chiller Plant.pdf
    .pdf203 KB
    Download
  • ATTACHMENT 5 - Asbestos Report.pdf
    .pdf6.3 MB
    Download

Contacts

Explore more