EHRM Infrastructure Upgrades Construction - Syracuse - Project 528A7-22-700
- Response deadline
- May 20, 2026 Closed
- Date posted
- Apr 30, 2026
- Source
- Open notice
Description
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for EHRM INFRASTRUCTURE UPGRADES as required by drawings and specifications. Project scope includes, but is not limited to, the following infrastructure upgrades: Upgrading facility fiber throughout the buildings to each IT closet; Providing redundant fiber runs throughout the facility to each IT closet; Providing redundant fiber mains to the demarcation room from the provider point; Providing Cat 6A cabling from IT closets to all points of use as required; Installation of additional IT outlets and electrical outlets throughout the facility; Provide additional outlets in each IT closet; Upgrade facility power distribution including UPS as required; Upgrade facility HVAC distribution as required; Upgrades to physical security; Abatement of hazardous materials; New construction of Data Center server room. Includes Buildings 1, 2, 16, Rome Community-Based Outpatient Clinic (CBOC), and site.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- MCI East Barracks Industrialized Construction Projects for Barracks via Other Transaction Authority (10 USC 2808a)Due Oct 29, 2026
- N3319125C6015P00001 J&A
- Chino Emergency RepairsArizonaDue Nov 9, 2026
- 657-26-102JC FCA Replace Various Roofs on BLDG 1, JCDue Nov 4, 2026
- 613-22-700 | EHRM Infrastructure Upgrades Construction | Martinsburg, WVWest VirginiaDue Nov 6, 2026
- Market Intelligence - Progressive Design-Build - Blood Donation CenterDue Nov 9, 2026