Y1BG--EHRM Infrastructure Upgrades Construction - Syracuse - Project 528A7-22-700
- Response deadline
- Jul 7, 2026 Closed
- Date posted
- Jun 17, 2026
- Source
- Open notice
Description
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for EHRM INFRASTRUCTURE UPGRADES as required by drawings and specifications. Project scope includes, but is not limited to, the following infrastructure upgrades: Upgrading facility fiber throughout the buildings to each IT closet; Providing redundant fiber runs throughout the facility to each IT closet; Providing redundant fiber mains to the demarcation room from the provider point; Providing Cat 6A cabling from IT closets to all points of use as required; Installation of additional IT outlets and electrical outlets throughout the facility; Provide additional outlets in each IT closet; Upgrade facility power distribution including UPS as required; Upgrade facility HVAC distribution as required; Upgrades to physical security; Abatement of hazardous materials; New construction of Data Center server room. Includes Buildings 1, 2, 16, Rome Community-Based Outpatient Clinic (CBOC), and site.
Classifications
Documents (38)
- DownloadATTACHMENT 7 - Drawings Structural Updated 5-20-26.pdf.pdf5.1 MB
- DownloadATTACHMENT 9 - Drawings Telecommunications Updated 5-20-26.pdf.pdf49.0 MB
- DownloadC - 52.222-90 Addressing DEI Discrimination by Federal Contractors - APR 2026.pdf.pdf87 KB
- Download36C77626B0009 0003.pdf.pdf196 KB
- DownloadATTACHMENT 6 - Drawings Mechanical.pdf.pdf19.3 MB
- Download36C77626B0009 0004.pdf.pdf142 KB
- DownloadATTACHMENT 12 - Brand Name Justification.pdf.pdf121 KB
- DownloadATTACHMENT 1 - SPEC DIV 01-13.pdf.pdf23.7 MB
- DownloadATTACHMENT 3 - SPEC DIV 25-28.pdf.pdf24.5 MB
- Download36C77626B0009 0002.pdf.pdf145 KB
- Download36C77626B0009 0005.pdf.pdf145 KB
- DownloadATTACHMENT 7 - Drawings Structural.pdf.pdf5.3 MB
- DownloadATTACHMENT 4 - Drawings General - Architectural.pdf.pdf49.4 MB
- DownloadATTACHMENT 5 - Drawings Electrical Updated 5-20-26.pdf.pdf50.0 MB
- DownloadVAAR 852.204-70 Personal Identity Verification of Contractor Personnel - DEV MAR 2026.pdf.pdf81 KB
- DownloadATTACHMENT 1 - SPEC DIV 01-13 Updated 6-3-26.pdf.pdf23.8 MB
- DownloadTechnical Questions Responses - Syracuse EHRM - 6-9-26.pdf.pdf954 KB
- DownloadATTACHMENT 4 - Drawings General - Architectural Updated 5-20-26.pdf.pdf50.0 MB
- DownloadATTACHMENT 11 - Syracuse Campus Map.pdf.pdf2.8 MB
- DownloadATTACHMENT 15 - Construction Wage Rates - Onondaga 1-30-26.pdf.pdf60 KB
- DownloadATTACHMENT 8 - Drawings Technology Updated 5-20-26.pdf.pdf5.8 MB
- DownloadATTACHMENT 6 - Drawings Mechanical Updated 5-20-26.pdf.pdf19.4 MB
- Download36C77626B0009 0007.pdf.pdf145 KB
- DownloadATTACHMENT 16 - Site Visit Instructions.pdf.pdf449 KB
- Download36C77626B0009 0006.pdf.pdf147 KB
- DownloadATTACHMENT 15 - Construction Wage Rates - Onondaga 5-18-26.pdf.pdf65 KB
- DownloadATTACHMENT 2 - SPEC DIV 21-23.pdf.pdf22.1 MB
- DownloadATTACHMENT 9 - Drawings Telecommunications.pdf.pdf32.1 MB
- DownloadATTACHMENT 14 - Limitations on Subcontracting - Construction.docx.docx18 KB
- Download36C77626B0009 - 3-2-26.pdf.pdf737 KB
- DownloadATTACHMENT 13 - Pre-Construction Risk Assessment.pdf.pdf389 KB
- DownloadSite Visit Sign-in Sheet - Syracuse EHRM 3-11-26.pdf.pdf842 KB
- DownloadSection 23 09 23 Digital Control System HVAC - Updated 3-17-26.pdf.pdf258 KB
- DownloadATTACHMENT 5 - Drawings Electrical.pdf.pdf50.0 MB
- DownloadATTACHMENT 8 - Drawings Technology.pdf.pdf5.8 MB
- Download36C77626B0009 0001.pdf.pdf192 KB
- DownloadATTACHMENT 10 - Asbestos Report.pdf.pdf8.1 MB
- DownloadVAAR 852.204-72 Personnel Vetting and Credentialing MAR 2026 REV.pdf.pdf366 KB
Contacts
- Thomas Councilthomas.council@va.gov(216) 447-8321
- Bridget May