SOLICITATION for West Point Ski Lift System
- Response deadline
- Jul 31, 2026 Due in 4 days
- Date posted
- Jul 27, 2026
- Source
- Open notice
Description
2026.07.27- AMEND 0001 Post RFI questions & answers 2026.07.22- Upload Ski Lift Images, Manual, and Insepction Reports--See attached The Mission and Installation Contracting Command Installation Contracting Office, West Point, NY (MICC-West Point) is issuing this SOLICITATION DRAFT for West Point Ski Lift System. In order to be eligible for award, the offeror must be registered in the SAM.gov system as a small business concern. The offeror MUST also hold; an up-to-date, valid, and active ANSI B77.1-1999 certification. See attached documents for complete instructions, and requirement details The solicitation will be in electronic format only and will be available on the Internet at: https://www.sam.gov/. A site visit will be made available--It is industry’s responsibility to periodically check the West Point Visitor Center Control Requirements at https://www.westpoint.edu/gateway-for-visitors#all It is the offeror’s responsibility to check the SAM.gov provided as necessary for any posted changes.
Classifications
Documents (7)
- PAN 047099 W911SD-26-Q-A086 SITE VISIT NOTICE Ski Lift maint.pdf.pdf344 KBNot yet available
- PAN 047099 W911SD-26-Q-A086 SOLICITATION AMEND 0001 DRAFT Ski Lift maint.pdf.pdf4.3 MBNot yet available
- IMAGES Ski Lift System.pdf.pdf456 KBNot yet available
- Victor Constant Ski Inspection Maintenance Reports 2025.pdf.pdf176 KBNot yet available
- AMIM-MLP-25-028_PWS (Ski Lift Maintenance Service Contract).pdf.pdf197 KBNot yet available
- PAN 047099 W911SD-26-Q-A086 SOLICITATION D. Final Ski Lift maint.pdf.pdf3.2 MBNot yet available
- PAN 047099 W911SD-26-Q-A086 SOLICITATION DRAFT Ski Lift maint.pdf.pdf3.8 MBNot yet available
Contacts
Similar contracts
- Downs Pumping Unit Repairs & Generator ReplacementDue Aug 19, 2026
- Generator & ATS Maintenance and Repair for VA Northern California Health Care SystemCADue Aug 12, 2026
- Dock Leveler ReplacementMDDue Jul 31, 2026
- Generator and ATS Preventative MaintenanceCODue Aug 4, 2026
- Notice of Intent to Sole Source - Cascade MachineryWADue Jul 31, 2026
- Dock Leveler ReplacementMDDue Jul 31, 2026