N091--PROJECT # 528-18-110 Fuel Oil Tank Replacement BUFFALO VAMC
- Response deadline
- Aug 4, 2026 Due in 17 days
- Date posted
- Jul 2, 2026
- Source
- Open notice
Description
The general scope of this project is to remove the existing three (3) 40,000-gallon fuel tanks and one (1) 7,500-gallon spill connection tank and replace them with appropriately sized modern tanks and to replace the monitoring/control systems to improve maintainability, meet the backup fuel supply requirements, and meet regulatory compliance requirements. The Buffalo VAMC requires a Contractor to perform the construction work necessary to accomplish this goal. The Contractor shall provide all supervision, labor, services, tools, equipment, and materials required to perform work. Work under this effort is fully described in the project drawings and specifications. Additional administrative and management related requirements are described throughout this document. A brief overview of the construction work will be included with SOW in the solicitation. See SOW and Solicitations documents
Classifications
Documents (6)
- DownloadBUY AMERICAN ACT CERTIFICATE 52.225-2.pdf.pdf68 KB
- Download528-18-110 Construction Bid Drawings March 2026.pdf.pdf50.0 MB
- Download528-18-110 - Final Specifications.pdf.pdf5.2 MB
- DownloadP07 - WAGE DETERMINATION.pdf.pdf57 KB
- DownloadS02 - 36C24226B0057 SOLICITATION - FUEL OIL TANK REPLACEMENT - BUF.docx.docx295 KB
- DownloadLIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75 - blank.pdf.pdf76 KB
Contacts
- Idalia Algarinidalia.algarin@va.gov716-862-7461 x 22395