HOWITZER CONTROL LEVER PER DRAWING
- Response deadline
- Aug 3, 2026 Closed
- Date posted
- Jul 20, 2026
- Source
- Open notice
Description
NO PHONE INQUIRIES- EMAIL ONLY 100% SMALL BUSINESS SET ASIDE IN ORDER TO RECIEVE THE DRAWINGS, YOU WOULD NEED TO BE A SMALL BUSINESS, AN ACTIVE SAM, AND HAVE A CURRENT, VALID JCP CERTIFICATION. IN ORDER TO BE ELIGIBLE FOR AWARD, YOU WOULD NEED TO BE A SMALL BUSINESS, HAVE VALID JCP CERTIFICATION AND BE REGISTERED AS A SMALL BUSINESS WITH AN ACTIVE SAM RECORD. CLIN 0001- 219 EACH, FIRST ARTICLE APPROVAL REQUIRED: Lever, per Drawing # 11583608, Initial Release, for 155mm M284 Cannon. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as EXHIBIT A; along with general data drawings, attachment A. Inspection Required. CLIN 0002- 219 EACH, FIRST ARTICLE APPROVAL WAIVED: Lever, per Drawing # 11583608, Initial Release, for 155mm M284 Cannon. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as EXHIBIT A; along with general data drawings, attachment A. Inspection Required.
Classifications
Documents (7)
- 11583608.pdf.pdf200 KBNot yet available
- E_-613800Q7-11583608.docx.docx25 KBNot yet available
- 12521199_3 shts_rev A (3).pdf.pdf1.2 MBNot yet available
- A_-613800Q7-11583608.docx.docx33 KBNot yet available
- QAP_11583608.pdf.pdf131 KBNot yet available
- 010731-QAP-APPX-BL.docx.docx64 KBNot yet available
- W911PT26QA110.pdf.pdf4.5 MBNot yet available
Contacts
Similar contracts
- 53--PACKING ASSEMBLYDue Aug 27, 2026
- 49--GAGE,CHECK,SEATING,Due Aug 24, 2026
- Lock Bracket AssemblyDue Aug 27, 2026
- Cisco Firewall Tray MountsCaliforniaDue Aug 19, 2026
- 49--FIXTURE,AIRCRAFT MADue Sep 14, 2026
- TORMACH KINGLEADERDue Aug 19, 2026