Forward Hadronic Calorimeter Absorber Structures
- Response deadline
- Aug 10, 2026 Closed
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
Please thoroughly review all attachments to this solicitation for details. Failure to respond in accordance with the RFP's instructions may deem your proposal as unacceptable. All questions shall be submitted in writing to the Contract Specialist via email. Amendment 4 issued on 7/23/2026 is to add an updated Questions & Answers document based on the re-release of the RFP. Amendment 3 issued on 7/10/2026 is to reopen the RFP with revised SOW, Spec, and Drawings. Amendment 2 issued on 3/20/2026 is to extend the deadline to 4/1/2026 and update the Statement of Work and Specification documents. Amendment 1 issued on 3/5/2026 is to extend the deadline to 3/20/2026. An updated Specification and SOW are forthcoming and will be posted when they are finalized. The RFP's question and answers document has also been added as an attachment.
Classifications
Documents (12)
- RFP 457842 Questions Answers_72326.pdf.pdf276 KBNot yet available
- Attachment E - Drawing EPC-FWD-HCL-DET-ASM-200.pdf.pdf852 KBNot yet available
- B.1 Enclosure 3 – AMS Form 043, Proposal Pricing Sheet.pdf.pdf410 KBNot yet available
- Attachment F - BNL-QA-101.pdf.pdf235 KBNot yet available
- Attachment A - BSA General Terms and Conditions for Non-Commercial Items Rev 24 (April 2026).pdf.pdf391 KBNot yet available
- Attachment C - Technical Specification EIC-DET-SPC-021 dated 6-18-26.pdf.pdf460 KBNot yet available
- Attachment D - Drawing EPC-FWD-HCL-DET-ASM-100.pdf.pdf960 KBNot yet available
- Attachment B - EIC-DET-SOW-026 Statement of Work for the Forward Hadronic Calorimeter Absorber Structure Rev. 7 dated 06-18-26.pdf.pdf525 KBNot yet available
- B.1 RFP 457842.pdf.pdf386 KBNot yet available
- Attachment G - RFP 457842 Questions and Answers.pdf.pdf230 KBNot yet available
- B.1 Enclosure 1 - Contract 457842.pdf.pdf251 KBNot yet available
- B.1 Enclosure 2 – AMS Form 050, Annual Representations and Certifications.pdf.pdf1.7 MBNot yet available
Contacts
Similar contracts
- Active Vehicle Barriers and Associated Control System at Osan Air BaseDue Oct 15, 2026
- Window, ObservationDue Oct 13, 2026
- Frame Section, StructurDue Oct 14, 2026
- Adapter, Straight, PiDue Oct 13, 2026
- Hose Assembly, NonmetalDue Oct 14, 2026
- Electron Storage Ring D2 Dipole MagnetsNew YorkDue Oct 14, 2026