SAM.govMB457842
Open
Forward Hadronic Calorimeter Absorber Structures
- Response deadline
- Aug 10, 2026 Closed
- Date posted
- Jul 10, 2026
- Source
- Open notice
Description
Please thoroughly review all attachments to this solicitation for details. Failure to respond in accordance with the RFP's instructions may deem your proposal as unacceptable. All questions shall be submitted in writing to the Contract Specialist via email. Amendment 3 issued on 7/10/2026 is to reopen the RFP with revised SOW, Spec, and Drawings. Amendment 2 issued on 3/20/2026 is to extend the deadline to 4/1/2026 and update the Statement of Work and Specification documents. Amendment 1 issued on 3/5/2026 is to extend the deadline to 3/20/2026. An updated Specification and SOW are forthcoming and will be posted when they are finalized. The RFP's question and answers document has also been added as an attachment.
Classifications
Documents (11)
- DownloadAttachment E - Drawing EPC-FWD-HCL-DET-ASM-200.pdf.pdf852 KB
- DownloadB.1 Enclosure 3 – AMS Form 043, Proposal Pricing Sheet.pdf.pdf410 KB
- DownloadAttachment F - BNL-QA-101.pdf.pdf235 KB
- DownloadAttachment A - BSA General Terms and Conditions for Non-Commercial Items Rev 24 (April 2026).pdf.pdf391 KB
- DownloadAttachment C - Technical Specification EIC-DET-SPC-021 dated 6-18-26.pdf.pdf460 KB
- DownloadAttachment D - Drawing EPC-FWD-HCL-DET-ASM-100.pdf.pdf960 KB
- DownloadAttachment B - EIC-DET-SOW-026 Statement of Work for the Forward Hadronic Calorimeter Absorber Structure Rev. 7 dated 06-18-26.pdf.pdf525 KB
- DownloadB.1 RFP 457842.pdf.pdf386 KB
- DownloadAttachment G - RFP 457842 Questions and Answers.pdf.pdf230 KB
- DownloadB.1 Enclosure 1 - Contract 457842.pdf.pdf251 KB
- DownloadB.1 Enclosure 2 – AMS Form 050, Annual Representations and Certifications.pdf.pdf1.7 MB
Contacts
Similar contracts
- Active Vehicle Barriers and Associated Control System at Osan Air BaseDue Oct 1, 2026
- Bushing, NonmetallicDue Sep 15, 2026
- Hose Assembly, NonmeDue Sep 11, 2026
- Ring, SecurityDue Sep 11, 2026
- Isotropic Polycrystal Platinum (Pt) CylindersDue Sep 9, 2026
- 50 SFS Drop Arm Barrier SystemColoradoDue Sep 15, 2026