Fabricate and Install New Structural Steel Flooring System at the Watervliet Arsenal, NY
- Response deadline
- May 7, 2026 Closed
- Date posted
- Apr 23, 2026
- Source
- Open notice
Description
Contractor to provide the design, materials, installation, workmanship, fabrication, assembly, erection, inspection, quality control, and testing of a new structural steel flooring system required to support manufacturing equipment in Building 35 at the Watervliet Arsenal (WVA). All work to be conducted in accordance with the Statement of Work (see section J of the solicitation). Wage Determination General Decision Number: NY2 Latest Reviison applies and is incorporated. Magnitude of the project is between $25,000 and $100,000. Period of performance is 90 days from issuance of Notice to Proceed. 100% Payment (and Performance if price is over $150k) bonds are required. Solicitation is set-aside for small business and will result in a firm fixed-price contract. Site visit will be conducted on 28 April 2026 @ 2:00pm. See page 3 of solicitation for further details.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- WSTF Tank Pipe InsulationWashingtonDue Nov 3, 2026
- Elevator Equipment and Systems Recurring Preventative Maintenance and Non-Wear-and-Tear RepairsDue Nov 9, 2026
- UIL Generator ReplacementWashingtonDue Nov 13, 2026
- 561A4-25-500 Elevator Repair Building 6 and 53New JerseyDue Nov 20, 2026
- Vertical Transportation Equipment (VTE) Maintenance, Repair, & Inspection ServicesArkansasDue Nov 18, 2026
- JLM Roll Up Door ReplacementARDue Nov 18, 2026