SAM.gov12445526Q0100
Open
Monongahela National Forest FR 81 Bridge Work
- Response deadline
- Aug 12, 2026 Closed
- Date posted
- Jul 15, 2026
- Source
- Open notice
Description
The Monongahela National Forest has a requirement for furnishing and installing one (1) single span steel girder, timber deck, and full width timber wearing surface bridge on FR 81 on the Monongahela National Forest. The work shall include, but not be limited to, construction survey and staking, E&S, clearing and grubbing, installation of cofferdam and dewatering the site, excavation for placement of riprap, removal of existing structure, installation of bridge structure, wearing surface installation, H-Pile installation, roadway subbase and aggregate, and riprap armoring.
Classifications
Documents (9)
- C04_FR 81 Big Laurel Creek SOI Bid Alt 1.pdf.pdf70 KBNot yet available
- C04_FR 81 Big Laurel Creek Map.pdf.pdf13.7 MBNot yet available
- C04_FR 81 Big Laurel Creek SOW.pdf.pdf439 KBNot yet available
- 12445526Q0100.pdf.pdf273 KBNot yet available
- C04_FR 81 Big Laurel Creek SOI Bid Alt 2.pdf.pdf70 KBNot yet available
- C04_FR 81 Big Laurel Creek Supplemental Specs.pdf.pdf1.6 MBNot yet available
- C04_WDOL_DBA_Webster.pdf.pdf39 KBNot yet available
- C04_FR 81 Big Laurel Creek Bridge Plans.pdf.pdf6.5 MBNot yet available
- C04_FR 81 Big Laurel Creek SOI.pdf.pdf78 KBNot yet available
Contacts
Similar contracts
- Tailwater and Control Tower paving, sealing, and striping for Nolin River LakeDue Sep 10, 2026
- Replace Foundation Concrete and Anchor Bolts, BAK-12 SystemCaliforniaDue Sep 8, 2026
- Z--Road/Parking Lot Striping, Lava Beds NMCADue Sep 9, 2026
- Improve Hamat RunwayDue Oct 5, 2026
- Repair A Avenue at Building 300Due Sep 9, 2026
- Permanent Pavement MarkingDue Sep 14, 2026