EOU Sunshades Creech AFB
- Response deadline
- Aug 7, 2026 Due in 13 days
- Date posted
- Jul 24, 2026
- Source
- Open notice
Description
The Experimental Operations Unit (EOU) at Creech AFB requires the purchase and installation of four shade structures for the CCA aircraft based on site. Also, the relocation of the four existing structures and demolition of the 5th sunshade. Four current sunshades will be turned perpendicular and align with the new sunshades. The contractor shall design, provide, and construct the following shade structures on the airfield's parking apron: 1) Four CCA shade structures that include four aircraft parking bays each. The new shade structures will be located on south ramp west of the current shade structures. 2) Column concrete footings, per footing, as needed. 3) The new shade structures will adhere to the following requirements: The shade structure will require LED lights and their conduit, CU wiring, service power outlets, a service panel and its Una-strut support assembly, and a solar battery powered obstruction light. 4) PVA (Photovoltaic Array) or solar paneling with 12 hour battery pack for LED lighting and shade structure. Attachment 1: Combo Attachment 2: SOW Attachment 3: Sunshade Map
Classifications
Documents (3)
- Attachment 3 - Sunshade Map.pptx.pptx759 KBNot yet available
- Attachment 1 - Combo 1.pdf.pdf1.7 MBNot yet available
- Attachment 2 - EOU Sunshades - SOW.pdf.pdf2.0 MBNot yet available
Contacts
Similar contracts
- Outdoor Recreation - Mobile BleachersFLDue Jul 29, 2026
- Install Holding Cell Lt. Area � Federal Correctional Institution (FCI) OxfordWI
- MEX-NEC SCAFFOLDING FOR COOLING TOWERS PREVENTIVE MAINTENANCEMX-CMXDue Aug 7, 2026
- Outdoor Recreation - Mobile BleachersFLDue Jul 29, 2026
- 44--COOLER,FLUID,INDUSTRIADue Aug 3, 2026
- 44--BAFFLE,FLUID COOLER,INDue Aug 3, 2026