SAM.govN4008526R9077
Open
WWTP FC436 Clarifier Repairs and G575 Lift Station Repairs
DEPT OF DEFENSE · North Carolina
- Response deadline
- Aug 31, 2026 Due in 6 days
- Date posted
- Aug 25, 2026
- Source
- Open notice
Description
The work includes replacement of secondary clarifier no. 4 internal components, replacement of control panels for all four secondary clarifiers. (PWO 24-0045) The work at G575 includes phased construction of upgrades to manholes and piping(removal/replacement/new installation); removal and replacement of submersible pumps and removal and replacement of the existing crane over the wet well. (PWO 26-0044)
Classifications
Documents (18)
- Amend 0004.pdf.pdf147 KBNot yet available
- RFP 240045.pdf.pdf174 KBNot yet available
- Amendment 0006.pdf.pdf150 KBNot yet available
- 26-0044 Asbestos and Lead-Paint Survey.pdf.pdf3.7 MBNot yet available
- IFC_SpecsAsOne_240045FC436ClariferRepairs_REV1.pdf.pdf3.0 MBNot yet available
- Amend 0002.pdf.pdf109 KBNot yet available
- N4008526B0044 Specs.pdf.pdf10.9 MBNot yet available
- Amend 0007.pdf.pdf131 KBNot yet available
- N4008526B0044 Dwgs_Signed.pdf.pdf13.8 MBNot yet available
- 26-0044 DM.pdf.pdf3.1 MBNot yet available
- N4008524B0045 Specs.pdf.pdf6.9 MBNot yet available
- 26-0044 APPD.pdf.pdf216 KBNot yet available
- 24-0045 AppendixD.pdf.pdf177 KBNot yet available
- N4008524B0045 Dwgs_Signed.pdf.pdf7.5 MBNot yet available
- Amend 0003.pdf.pdf61 KBNot yet available
- Amend 0001.pdf.pdf125 KBNot yet available
- Amend 0008.pdf.pdf116 KBNot yet available
- 26-0044 Basis of Design.pdf.pdf19.9 MBNot yet available
Contacts
Similar contracts
- NNSY DD4 DUCT INSULATION REPLACEMENTDue Sep 21, 2026
- Z--Montlake Methylene Chloride Fume HoodDue Sep 4, 2026
- Gateway Arch - Rainwater Capture Sediment CleanoutMissouriDue Sep 9, 2026
- J--MAINTENANCE OF HVAC SYSTEM
- Geothermal Repair, Detroit Lakes WMD, MNDue Sep 1, 2026
- Notice of Intent- Sole Source to TRANE INC.New YorkDue Aug 30, 2026