RR24-RR44 Sidewalk Repairs and MCASNR MTI Reflector Towers Concrete Pads
- Response deadline
- Aug 31, 2026 Closed
- Date posted
- Aug 13, 2026
- Source
- Open notice
Description
The work includes removal and replacement of damaged sidewalk portions located off Powder Lane on Stone Bay, Camp Lejeune NC as well as repair to any damaged grass and/or road that occurred during construction of this project. This scope of work is to be accomplished at MTI Reflector Towers 01, 05, 19 & 23 on the flightline aboard, New River, North Carolina. The work includes pouring (4) new 4" concrete slabs measuring 20'x22'-6" each over crushed rock at existing MTI reflector locations. (3) of the sites will include minimal site work to ensure level slab, (1) site includes building of retaining wall and dirt infill to create level slab. Each concrete slab will have (2) 2” Sch 40 PVC conduits built into slab and ran below grade 5’ beyond slab edge for future use.
Classifications
Documents (12)
- Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf.pdf4.5 MBNot yet available
- Amend 0001.pdf.pdf109 KBNot yet available
- Amend 0005.pdf.pdf830 KBNot yet available
- Combined DIV 01 specs small projects.pdf.pdf555 KBNot yet available
- Amend 0003.pdf.pdf95 KBNot yet available
- 25-0428 RR24-RR44 SIDEWALK - TOWER PAD - PD.pdf.pdf50 KBNot yet available
- Amend 0004.pdf.pdf199 KBNot yet available
- 25-0428 RR24-RR44 SIDEWALK - TOWER PAD - SR.pdf.pdf62 KBNot yet available
- Amend 0002.pdf.pdf211 KBNot yet available
- 25-0428 RR24-RR44 SIDEWALK - TOWER PAD - SOW.pdf.pdf1.2 MBNot yet available
- RFP 250428.pdf.pdf217 KBNot yet available
- MAXIMO Initial Equipment Inventory and Replacement.pdf.pdf95 KBNot yet available
Contacts
Similar contracts
- Notice of Intent (NOI) to Sole Source for SAFB Taxiway Repairs at SAFB, ILIllinoisDue Oct 14, 2026
- CO NP BLCA 10(1) South Rim DriveColoradoDue Oct 8, 2026
- Opportunity Available to NM FERM BPA Zone 1 Contractors ONLY with the USDA Forest ServiceNew MexicoDue Oct 22, 2026
- Bonneville Lock and Dam - Navigation Lock 1 Bridge ReplacementOregonDue Oct 8, 2026
- Sidewalk Replacement Throughout Lyons CampusDue Oct 9, 2026
- Airfield Civil Works IDIQDue Oct 5, 2026