RR24-RR44 Sidewalk Repairs and MCASNR MTI Reflector Towers Concrete Pads
- Response deadline
- Aug 31, 2026 Closed
- Date posted
- Aug 11, 2026
- Source
- Open notice
Description
The work includes removal and replacement of damaged sidewalk portions located off Powder Lane on Stone Bay, Camp Lejeune NC as well as repair to any damaged grass and/or road that occurred during construction of this project. This scope of work is to be accomplished at MTI Reflector Towers 01, 05, 19 & 23 on the flightline aboard, New River, North Carolina. The work includes pouring (4) new 4" concrete slabs measuring 20'x22'-6" each over crushed rock at existing MTI reflector locations. (3) of the sites will include minimal site work to ensure level slab, (1) site includes building of retaining wall and dirt infill to create level slab. Each concrete slab will have (2) 2” Sch 40 PVC conduits built into slab and ran below grade 5’ beyond slab edge for future use.
Classifications
Documents (11)
- DownloadContractor Environmental Guide Updated Format_20231009 with ESOP.pdf.pdf4.5 MB
- DownloadAmend 0001.pdf.pdf109 KB
- DownloadCombined DIV 01 specs small projects.pdf.pdf555 KB
- DownloadAmend 0003.pdf.pdf95 KB
- Download25-0428 RR24-RR44 SIDEWALK - TOWER PAD - PD.pdf.pdf50 KB
- DownloadAmend 0004.pdf.pdf199 KB
- Download25-0428 RR24-RR44 SIDEWALK - TOWER PAD - SR.pdf.pdf62 KB
- DownloadAmend 0002.pdf.pdf211 KB
- Download25-0428 RR24-RR44 SIDEWALK - TOWER PAD - SOW.pdf.pdf1.2 MB
- DownloadRFP 250428.pdf.pdf217 KB
- DownloadMAXIMO Initial Equipment Inventory and Replacement.pdf.pdf95 KB
Contacts
Similar contracts
- Z--St. Marks NWR Aucilla Tram Road Bridge DBDue Oct 19, 2026
- AZ BL COLO 7528(1) Burro Creek RoadArizonaDue Nov 17, 2026
- UT NP ARCH 100(2) Bridges on Delicate Arch RoadUtahDue Nov 10, 2026
- Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1)New YorkDue Dec 1, 2026
- HI FLAP CR562(1) Kilauea PointHawaii
- Repair Storm Damage Imperial Dam Road at YPG, AZDue Oct 21, 2026