SAM.govN4008526R9049
Open
FY26 Multiple Location BEQ Chiller Loop Flushing and Chemical Cleaning
DEPT OF DEFENSE · North Carolina
- Response deadline
- Sep 9, 2026 Due in 7 days
- Date posted
- Sep 1, 2026
- Source
- Open notice
Description
Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
Classifications
Documents (16)
- 26M086CN Multiple BEQ HVAC Chiller Loop Flushing PD.pdf.pdf181 KBNot yet available
- Amend 0003.pdf.pdf33 KBNot yet available
- Amend 0005.pdf.pdf190 KBNot yet available
- Drawings dtd 8.25.26.pdf.pdf19.2 MBNot yet available
- Drawings dtd 8.27.26.pdf.pdf50.0 MBNot yet available
- Combined DIV 01 DBB specs.pdf.pdf560 KBNot yet available
- Amend 0006.pdf.pdf186 KBNot yet available
- Amend 0002.pdf.pdf33 KBNot yet available
- Amend 0008.pdf.pdf33 KBNot yet available
- Amend 0009.pdf.pdf57 KBNot yet available
- Amend 0007.pdf.pdf109 KBNot yet available
- RFP 260431.pdf.pdf109 KBNot yet available
- 26M086CN Multiple BEQ HVAC Chiller Loop Flushing SOW.pdf.pdf90 KBNot yet available
- Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf.pdf4.5 MBNot yet available
- Amend 0004.pdf.pdf33 KBNot yet available
- Amend 0001.pdf.pdf104 KBNot yet available
Contacts
Similar contracts
- FRC Ground Level HVAC and Roof ReplacementTexasDue Sep 9, 2026
- 573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMCFloridaDue Sep 9, 2026
- Replacement of Conference Room, and Command Suite WindowsAlaskaDue Sep 9, 2026
- FCI Seagoville Hot Water Generator ReplacementTexasDue Sep 16, 2026
- MAHG 17-1095 Stennis HallMississippiDue Sep 9, 2026
- Z--DENA 332037 Eielson Roof ReplacementDue Oct 1, 2026