SAM.govFA940126R0019
Open
Replace HVAC West Fitness Center
DEPT OF DEFENSE · NM
- Response deadline
- Aug 5, 2026 Closed
- Date posted
- Jun 30, 2026
- Source
- Open notice
Description
Design and Construction service to completely replace the old heating and cooling system in the West side Fitness Center B585. Design, provide and install a new complete Heating, Ventilation, and Air Conditioning (HVAC) system. All services and materials to complete the work IAW the SOW. See Attachment 1 - SOW for more details. The budget parameters for this budget are between $1,000,000.00 and $1,400,000.00.
Classifications
Documents (10)
- Attachment 4 - B585 As-Builts.pdf.pdf22.7 MBNot yet available
- Attachment 6-B585 Existing Utilities.pdf.pdf1.5 MBNot yet available
- Attachment 1 - SOW.pdf.pdf197 KBNot yet available
- Attachment 8 - Kirtland Air Force Base Low and Medium-Voltage Electrical Design and Equipmen.pdf.pdf179 KBNot yet available
- Attachment 5 - Project Location and Floorplan.pdf.pdf3.0 MBNot yet available
- Attachment 7 - Kirtland AFB Comm Division Specs 15 May 2025.pdf.pdf1.2 MBNot yet available
- Solicitation - FA940126R0019.pdf.pdf570 KBNot yet available
- Attachment 2 - Evaluation Factors.pdf.pdf110 KBNot yet available
- Attachment 3 - Wage Determination - Building.pdf.pdf1.6 MBNot yet available
- Attachment 9 - Environmental Checklist-14Apr26.pdf.pdf1.5 MBNot yet available
Contacts
Similar contracts
- Condensate Pump ReplacementsCTDue Sep 9, 2026
- Boiler Water Treatment ServiceCaliforniaDue Sep 8, 2026
- Annual Boiler Maintenance ServiceCaliforniaDue Sep 8, 2026
- BHNF Remove and replace electric water heaterSouth DakotaDue Sep 2, 2026
- B40 Heat pump ReplacementKansasDue Sep 14, 2026
- Repair Condensate PumpsCaliforniaDue Sep 8, 2026