ISP CAT-6 Cabling for B2038
- Response deadline
- Jul 17, 2026 Due in 0 days
- Date posted
- Jul 9, 2026
- Source
- Open notice
Description
This project will be located on Kirtland Air Force Base (AFB), New Mexico. the primary goal of this project is to engineer, furnish, install, and test (EFI&T) an upgrade of existing premises wiring or ISP infrastructure to new Cat-6 cabling for B20388. The contractor shall furnish all services, materials, supplies, equipment, permits, investigation, studies, specifications, drawings and supervision as required in connection with the Statement of Objectives (SoO) for the design, ordering and installation of a successful completed project. All work shall be in strict compliance with all applicable codes as adopted and modified by the State of New Mexico, Federal and Kirtland AFB building codes. Please review the Statement of Objectives (SoO) and other attachments for more information. Amendment 0001 updated page 6 of 24 of the soliciation (Period of Performanece).
Classifications
Documents (7)
- DownloadDBA Wage Determination.pdf.pdf62 KB
- DownloadRFI_Questions_B20388.pdf.pdf68 KB
- DownloadSOO for ISP at B20388.pdf.pdf491 KB
- DownloadSolicitation Amendment - FA940126R00140001.pdf.pdf575 KB
- DownloadKirtland AFB Communications Specifications.pdf.pdf1.2 MB
- DownloadSolicitation - FA940126R0014.pdf.pdf574 KB
- DownloadSolicitation Amendment FA940126R00140001 SF 30.pdf.pdf373 KB
Contacts
- SSgt Joshua Barberjoshua.barber.6@us.af.mil5058534263
- Abigail R. Turnerabigail.turner.2@us.af.mil5058462596