B1043 Install Backup Generator
- Response deadline
- Aug 12, 2026 Due in 16 days
- Date posted
- Jul 27, 2026
- Source
- Open notice
Description
This project will be located on Kirtland Air Force Base (AFB), New Mexico. The primary goal of this project is to provide the installation of generator backup power to 377 ABW communication systems in B1043. The contractor shall furnish all services, materials, supplies, equipment, permits, investigation, studies,specifications, drawings and supervision as required in connection with the Statement of Work (SoW) for the design, ordering and installation of a successful completed project. All work shall be in strict compliance with all applicable codes as adopted and modified by the State of New Mexico, Federal and Kirtland AFB building codes. Please review the Statement of Work(SoW) and other attachments for more information. 2026.07.27_Memo RE_2nd Site Visit
Classifications
Documents (7)
- Evaluation Criteria 080079 Install Backup Generator.pdf.pdf160 KBNot yet available
- 01b. Attachment B-Kirtland AFB Low and Medium-Voltage Electrical Design and Equipment Req.pdf.pdf284 KBNot yet available
- Solicitation memo.pdf.pdf103 KBNot yet available
- 01a. Attachment A-Bldg1043_Floor Plan.pdf.pdf130 KBNot yet available
- 01. MMHMV080079 DB_SOW Generator B1043 02JUN2026.pdf.pdf323 KBNot yet available
- 01c. Attachment C-EAL Template (Wing template).docx.docx236 KBNot yet available
- Solicitation - FA940126R0020.pdf.pdf590 KBNot yet available
Contacts
Similar contracts
- J061--Building 65 Electrical Switch 1 RepairDue Aug 3, 2026
- Large-Tier Electrical Construction IDIQMDDue Aug 12, 2026
- Fiber Optic Cable InstallationTXDue Aug 7, 2026
- 508-22-104 | Upgrade PACS SystemGADue Aug 19, 2026
- Residential Electrical Distribution and backup power system upgrade for U.S. Embassy Quito at Government Owned Residential compound ZibaEC-PDue Sep 4, 2026
- 22 MXS - Power Pitts & Jet Power Unit Troubleshooting - McConnell AFBKSDue Aug 11, 2026