Village Grande Pump Station Force Main Lining
- Response deadline
- Sep 17, 2026 Due in 12 days
- Date posted
- Sep 4, 2026
- Source
- Open notice
Description
The scope of Work contemplated for the abovenamed Project includes the location and lining of an existing 6” force main with a flexible fiber reinforced liner. Specific work will include completion of test pits to locate the existing force main alignment; installation of a temporary bypass system; excavation of access pits; force main lining; force main pipe replacement where necessary; replacement of air release valves, piping and fittings; rehabilitation of the existing discharge manhole; pavement and driveway restoration as noted; and other miscellaneous site improvements; as well as all other Work of any type or description necessary for completion of the Project, whether or not specifically described in these Contract Documents. All Work on this Contract shall be completed within Three Hundred (300) Calendar Days from Notice to Proceed.
Documents
No documents posted for this opportunity.
Similar contracts
- Copy of Planning Board Conflict Engineering ServicesNJDue Sep 11, 2026
- Planning Board Conflict Engineering ServicesNJDue Sep 1, 2026
- School Crossing Guard ServicesNJDue Aug 4, 2026