Civic AI
Civic AI
Procurement intelligence
SAM.gov36C77626B0024
Open

Z1DA--Upgrade Chiller Plant Construction Northport - Project 632-25-101

Response deadline
Sep 15, 2026
Due in 27 days
Date posted
Aug 19, 2026

Description

Work includes general construction and alterations, of the existing chiller plant and includes the necessary removal of existing building components, systems, construction and installation of certain other items. The project will be constructed in two phases. Phase 1 work shall be completed and fully operational, supporting the medical facility, before a notice to proceed with phase 2 work will be issued. The project includes the installation and maintenance of a temporary chiller plant to support the Medical Facility during construction. All temporary installations shall remain in service until the end of the project’s startup of the new chiller plant and final acceptance.

Classifications

Documents (16)

  • ATTACHMENT 6 - Pre-Construction Risk Assessment.pdf
    .pdf2.0 MBNot yet available
  • ATTACHMENT 7 - Infection Control Risk Assessment.pdf
    .pdf3.3 MBNot yet available
  • ATTACHMENT 10 - Site Visit Instructions.pdf
    .pdf3.8 MBNot yet available
  • 36C77626B0024 0001.pdf
    .pdf128 KBNot yet available
  • ATTACHMENT 3 - Drawings.pdf
    .pdf50.0 MBNot yet available
  • 36C77626B0024 0003.pdf
    .pdf127 KBNot yet available
  • 36C77626B0024 - 7-7-26.pdf
    .pdf885 KBNot yet available
  • 36C77626B0024 0002.pdf
    .pdf133 KBNot yet available
  • Site Visit Sign-in Sheet - Northport Chiller 7-16-26.pdf
    .pdf271 KBNot yet available
  • ATTACHMENT 2 - Specifications.pdf
    .pdf7.8 MBNot yet available
  • ATTACHMENT 8 - Limitations on Subcontracting - Construction.docx
    .docx18 KBNot yet available
  • ATTACHMENT 9 - Construction Wage Rates - Suffolk 5-18-26.pdf
    .pdf83 KBNot yet available
  • Technical Questions Responses - Northport Chiller - 8-5-26.pdf
    .pdf223 KBNot yet available
  • ATTACHMENT 4 - Existing Facility Drawings.pdf
    .pdf3.4 MBNot yet available
  • ATTACHMENT 1 - SOW - Upgrade Chiller Plant.pdf
    .pdf203 KBNot yet available
  • ATTACHMENT 5 - Asbestos Report.pdf
    .pdf6.3 MBNot yet available

Contacts

Similar contracts

Explore more