SAM.gov36C77626B0024
Open
Upgrade Chiller Plant Construction Northport - Project 632-25-101
VETERANS AFFAIRS, DEPARTMENT OF · New York
- Response deadline
- Sep 29, 2026 Due in 15 days
- Date posted
- Sep 14, 2026
- Source
- Open notice
Description
Work includes general construction and alterations, of the existing chiller plant and includes the necessary removal of existing building components, systems, construction and installation of certain other items. The project will be constructed in two phases. Phase 1 work shall be completed and fully operational, supporting the medical facility, before a notice to proceed with phase 2 work will be issued. The project includes the installation and maintenance of a temporary chiller plant to support the Medical Facility during construction. All temporary installations shall remain in service until the end of the project’s startup of the new chiller plant and final acceptance.
Classifications
Documents (20)
- Additional Technical Questions Responses - Northport Chiller - 9-11-26.pdf.pdf110 KBNot yet available
- Addendum 01 - Memorandum.pdf.pdf66 KBNot yet available
- ATTACHMENT 6 - Pre-Construction Risk Assessment.pdf.pdf2.0 MBNot yet available
- ATTACHMENT 7 - Infection Control Risk Assessment.pdf.pdf3.3 MBNot yet available
- ATTACHMENT 10 - Site Visit Instructions.pdf.pdf3.8 MBNot yet available
- 36C77626B0024 0001.pdf.pdf128 KBNot yet available
- Addendum 01 - Drawings.pdf.pdf10.4 MBNot yet available
- ATTACHMENT 3 - Drawings.pdf.pdf50.0 MBNot yet available
- 36C77626B0024 0003.pdf.pdf127 KBNot yet available
- 36C77626B0024 - 7-7-26.pdf.pdf885 KBNot yet available
- 36C77626B0024 0002.pdf.pdf133 KBNot yet available
- Site Visit Sign-in Sheet - Northport Chiller 7-16-26.pdf.pdf271 KBNot yet available
- ATTACHMENT 2 - Specifications.pdf.pdf7.8 MBNot yet available
- ATTACHMENT 8 - Limitations on Subcontracting - Construction.docx.docx18 KBNot yet available
- ATTACHMENT 9 - Construction Wage Rates - Suffolk 5-18-26.pdf.pdf83 KBNot yet available
- 36C77626B0024 0004.pdf.pdf133 KBNot yet available
- Technical Questions Responses - Northport Chiller - 8-5-26.pdf.pdf223 KBNot yet available
- ATTACHMENT 4 - Existing Facility Drawings.pdf.pdf3.4 MBNot yet available
- ATTACHMENT 1 - SOW - Upgrade Chiller Plant.pdf.pdf203 KBNot yet available
- ATTACHMENT 5 - Asbestos Report.pdf.pdf6.3 MBNot yet available
Contacts
- Contract Specialistthomas.council@va.gov(216) 447-8321
Similar contracts
- Replace Transformers and Electrical Panels, Nas Oceana-285, Virginia Beach, VADue Sep 18, 2026
- Provide Swing Gates Station BEQ'sNorth CarolinaDue Sep 16, 2026
- ACC004 Flight SimulatorAlaskaDue Sep 28, 2026
- 589A7-23-306 Renovate Bldg. 5 & 5B for Mental Health FY27 NRMKansasDue Oct 19, 2026
- Operation and Maintenance with Incidental Repair and Minor Construction IDIQ MATOC - East of the Mississippi RegionDue Sep 16, 2026
- Master Breacher Course (Construction Project) on Griswold Range for the Regimental Special Troops Battalion of the 75th Ranger Regiment in Fort Benning, GeorgiaGeorgiaDue Oct 3, 2026