SAM.govW911PT26QA140
Open
Rough Machined Spindles for the Watervliet Arsenal
DEPT OF DEFENSE · New York
- Response deadline
- Oct 5, 2026 Due in 14 days
- Date posted
- Sep 21, 2026
- Source
- Open notice
Description
390 Each - SPINDLE ROUGH MACHINED PER DRAWING #11581551 REV D, FOR 155mm M776 CANNON. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST 2,3,9,12,23 (DD FORM 1423) which is attached hereto as EXHIBIT A. Along with General Data Drawings ATTACHMENT A. ** INSPECTION REQUIRED** FIRST ARTICLE REQUIRED or WAIVED based on QA evaluation
Classifications
Documents (16)
- 8769067-P.pdf.pdf592 KBNot yet available
- 010731-QAP-APPX-BL.docx.docx64 KBNot yet available
- 12521199SHT1.pdf.pdf43 KBNot yet available
- W911PT26QA140.pdf.pdf4.5 MBNot yet available
- QAP_11581551-F.pdf.pdf34 KBNot yet available
- A_-620200M9-11581551.docx.docx27 KBNot yet available
- CN12.docx.docx23 KBNot yet available
- CN3.docx.docx23 KBNot yet available
- WVA-FORM-702-61-R-E.pdf.pdf532 KBNot yet available
- E_-620200M9-11581551.docx.docx25 KBNot yet available
- CN9.docx.docx24 KBNot yet available
- DWG_11581551-D.pdf.pdf190 KBNot yet available
- 12521199SHT2.pdf.pdf79 KBNot yet available
- CN23.docx.docx24 KBNot yet available
- 12521199SHT3.pdf.pdf57 KBNot yet available
- CN2.docx.docx24 KBNot yet available
Contacts
Similar contracts
- Vfd Frame Sub-Assy, in Repair/Modification ofDue Oct 23, 2026
- Nrp, Cable Tension aDue Sep 30, 2026
- Metal PartsMarylandDue Oct 21, 2026
- Jack Tester AssyDue Sep 28, 2026
- “Nsn 4920-01-156-0965, Test Set, Blade Fold Harness, Wsdc: Z9N, Aircraft, Fa-18, A-D, E/F, G (Growler).”VirginiaDue Oct 6, 2026
- Adapter Assembly, InterDue Oct 1, 2026