Bldg. 202 Chiller Replacement
- Response deadline
- Sep 11, 2026 Due in 13 days
- Date posted
- Aug 28, 2026
- Source
- Open notice
Description
Enclosed is a Request for Quote (RFQ) for Bldg. 202 Chiller Replacement. If you would like to submit a quotation, please follow all instructions below. Only one (1) award will be made as a result of this announcement. Quotations are due 11 September, 2026 at 11:00AM EST. Please complete and return the attached Pricing Worksheet and supporting documentation. All quotes and associated documents must be in English. All line items must be priced. Incomplete quotes will not be accepted. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available. The Government will award a contract resulting from this solicitation to the responsible offeror whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate quotes: (i) Price (ii) Technical Capability The Government will conduct a price analysis of all quotes received. Through this technique, the Government will determine whether the price is reasonable, complete and realistic. Quotes must include cutsheet product information on the proposed replacement chiller unit to be installed to allow the government to determine technical merit. In addition, all subcontractors must be identified on page 2 of the attached Pricing Worksheet. Failure to provide this information along with acknowledgement of any amendments will render the quote non-responsive and will be removed from further award consideration. Award will be made to the lowest priced quote that provides sufficient explanation/documentation to demonstrate their ability to conform to the requirements of the PWS. Wage Determination No. 2015-4159, Revision 34 dated 8/12/2026 applies to this procurement. If there are any questions regarding this requirement, please contact Mr. Joseph Kugler by email: joseph.kugler.1@us.af.mil. All offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their quote as prescribed under RFO FAR 4.203-1(b). Failure to be registered at time of quote submission may deem the offeror’s quote to be considered non-responsive and eliminated from any further award consideration. Therefore, offerors are highly encouraged to register immediately if they are interested in submitting a response to this requirement.
Classifications
Documents (15)
- Attachment 1.pdf.pdf572 KBNot yet available
- Pic 1 Elec nameplate.jpg.jpg792 KBNot yet available
- Pic 8 unit.jpg.jpg2.3 MBNot yet available
- Pricing Worksheet.pdf.pdf1.5 MBNot yet available
- Pic 7 unit.jpg.jpg2.2 MBNot yet available
- Pic 2 Pump nameplate.jpg.jpg638 KBNot yet available
- Pic 4 unit.jpg.jpg2.4 MBNot yet available
- Pic 5 unit.jpg.jpg2.4 MBNot yet available
- Pic 9 unit.jpg.jpg2.1 MBNot yet available
- Pic 6 unit.jpg.jpg2.5 MBNot yet available
- Pic 3 Module nameplate.jpg.jpg703 KBNot yet available
- Performance Work Statement.pdf.pdf346 KBNot yet available
- Attachment 1a..pdf.pdf128 KBNot yet available
- Provisions and Clauses.pdf.pdf57 KBNot yet available
- Wage Determination.pdf.pdf43 KBNot yet available
Contacts
- joseph.kugler.1@us.af.mil8455632831
- kevin.fenner.1@us.af.mil8455632832
Similar contracts
- Air Station Sacramento Heads, Locker Rooms, & Kitchenette Facility RenovationsCaliforniaDue Sep 16, 2026
- Shower Tub Replacement and Bathroom RestorationCaliforniaDue Sep 16, 2026
- Building 22-27 Bathroom Renovations at Sector San FranciscoCaliforniaDue Sep 16, 2026
- Male & Female Gym Locker Room Renovations at Sector San FranciscoCaliforniaDue Sep 16, 2026
- WWTP FC436 Clarifier Repairs and G575 Lift Station RepairsNorth CarolinaDue Aug 31, 2026
- J041--ED/RADIOLOGY AHU COIL REPLACEMENTDue Sep 8, 2026