WSMR Bridge Repair RR7B0003
- Response deadline
- Sep 8, 2026 Due in 8 days
- Date posted
- Aug 31, 2026
- Source
- Open notice
Description
PROJECT TITLE: WSMR BRIDGE REPAIR RR7B0003 PROJECT LOCATION: WHITE SAND MISSILE RANGE, NM THIS IS AN "INVITATION FOR BIDS". "THIS SOLICITATION W911SG26BA016 IS RELATED TO THE PRE-SOLICITATION W911SG26BA010" A BID GUARANTEE IS REQUIRED (SEE CLAUSE AT FAR 52.228-1). ALL BID BONDS MUST BE ORIGINALS; PHOTOCOPIES WILL NOT BE ACCEPTED. PERFORMANCE AND PAYMENT BONDS ARE REQUIRED. THIS PROJECT IS SET ASIDE FOR HUBZONE OWNED SMALL BUSINESSES. THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE IS 237310, WITH A SIZE STANDARD OF $45,000,000.00. THE MAGNITUDE OF CONSTRUCTION IS BETWEEN $500,000 AND $1,000,000. SALES TAX RATE FOR DONA ANA COUNTY, NEW MEXICO IS 6.4975% BID OPENING ADDRESS: MICC-FORT BLISS, 111 PERSHING RD. ROOM 220, FORT BLISS, TX 79916. THE AWARDEE OF THIS CONTRACT WILL BE REQUIRED TO PROVIDE A SUPERINTENDENT AT ALL TIMES WORK IS BEING PERFORMED ON THE PROJECT (SEE CLAUSE AT FAR 52.236-6). THE SUPERINTENDENT IS CONSIDERED A KEY POSITION. THIS POSITION SHALL NOT BE SUBCONTRACTED AND MUST WORK DIRECTLY FOR THE PRIME CONTRACTOR. ALL WORK SHALL BE PERFORMED SIMULTANEOUSLY . RESULTING CONTRACT WILL BE FIRM-FIXED-PRICE (FFP)
Classifications
Documents (9)
- DPW063133P-REPAIR BRIDGE RR7B0003-FINAL.pdf.pdf30.1 MBNot yet available
- WSMRbridgeRFI_RESPONSES_JS.docx.docx35 KBNot yet available
- OPSEC Repairs to Bridge 3 Photos 4.pdf.pdf50.0 MBNot yet available
- W911SG-26-BA016 Site Visit sign in sheet.pdf.pdf27 KBNot yet available
- WSMR Visitor Control Policy April 2024 (1).pdf.pdf1.3 MBNot yet available
- DPW063133P-Repair Bridge RR7B0003_SOW_FINAL.pdf.pdf430 KBNot yet available
- OPSEC Repairs to Bridge 3 Photos 3.pdf.pdf50.0 MBNot yet available
- Solicitation - W911SG26BA016.pdf.pdf6.3 MBNot yet available
- NM Wage Determination NM20260035.pdf.pdf49 KBNot yet available
Contacts
- flor.f.sanchez.civ@army.mil5209443343
- cuong.m.tran5.mil@army.mil9157440904
Similar contracts
- Repair of Pavement at Air Station San FranciscoCaliforniaDue Sep 16, 2026
- Pisgah North Ranger District Ditch Culvert Replacements and Road ReconditioningNorth CarolinaDue Sep 16, 2026
- Repair Aircraft Hangar Apron Concrete - Air Station North BendOregonDue Sep 11, 2026
- Repair/Replace Low Water Crossing (El Reno, OK)OklahomaDue Sep 23, 2026
- ID FLAP CLEAR 4783(1), Dent Bridge Road ImprovementsIdaho
- Fy26 Angeles National Forest Road MaintenanceCaliforniaDue Sep 10, 2026