SOR Waterline Repair
- Response deadline
- Sep 17, 2026 Due in 24 days
- Date posted
- Aug 24, 2026
- Source
- Open notice
Description
The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control systems on the southeast side of KAFB. This project shall provide a robust and reliable water supply from Pump Station 2 (PS2) to the SOR and HERTF reservoirs, replacing and upgrading existing infrastructure. This includes an 8-inch, Class 350 Ductile Iron Pipe (DIP) with cement-mortar lining and an asphaltic seal coat and all associated valves and fittings, upgrade the existing control system to add SCADA to the newly installed system, Portable Hoist for Pump and Motor Maintenance, a new 15,000-gallon tank to include a booster pumps to be installed prior to the PS2, and a new 5,000-gallon tank and pre-packaged pump station at the SOR site. A site visit will be held on 03 September 2026 at 1300 MST and all parties will meet at the Truman Gate Visitors Center to be sponsored onto base at 1200 MST. Please submit the full names, date of birth, and citzenship of your attendees NLT COB 28 August 2026 and advise if you require base passes to access Kirtland AFB to the Mrs. Abigail Crespin, abigail.crespin@us.af.mil and TSgt Hillarie Johnson, hillarie.johnson@us.af.mil. All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. Equitable Adjustments will be IAW RFO 52.212-4. Contractor Access to CUI attachments: If a contractor is accessing request to a restricted, government only document, they would need to submit the DD2345 for their company as part of their request. The justification (relevant business activity) in Block 4 of the DD2345 is used to determine access to controlled information they are requesting. Typically, companies include something about bidding on contracts as part of their relevant business activity. Submit a completed copy of the DD 2345 to the JCP link.
Classifications
Documents (16)
- 01c Attachment C - SOR Pump Station Detail.pdf.pdf566 KBNot yet available
- 01b. Attachment B - SOR Existing Waterline Layout.pdf.pdf2.2 MBNot yet available
- Solicitation - FA940126R0023.pdf.pdf708 KBNot yet available
- 02. Front End Specifications.pdf.pdf8.2 MBNot yet available
- Evaluation Factors R2-250008-Repair SOR Waterline.pdf.pdf134 KBNot yet available
- 04a. DD 2345.pdf.pdf61 KBNot yet available
- 04. DD2345 JCP Guide.pdf.pdf798 KBNot yet available
- 01d. Attachment D-Basis of Design Requirements 7 15 2026.docx.docx240 KBNot yet available
- 03. Blank Form for Contractor_s Proposal.pdf.pdf203 KBNot yet available
- 03. Blank Form for Contractor_s Proposal.xlsx.xlsx74 KBNot yet available
- Statement of Work - SOR Waterline Repair.pdf.pdf269 KBNot yet available
- 01d. Attachment D-Basis of Design Requirements 7 15 2026.pdf.pdf945 KBNot yet available
- Ombudsman and Contractor Access.pdf.pdf94 KBNot yet available
- Wage Determination - 08-10-2026.pdf.pdf238 KBNot yet available
- 01e. Attachment E - KAFB Low and Medium-Voltage Electrical Design and Equipment Requirements_2025.pdf.pdf179 KBNot yet available
- 01a. Attachment A - SOR Waterline Detail.pdf.pdf2.8 MBNot yet available
Contacts
Similar contracts
- Town of Cairo - Water System Improvement ProjectDue Sep 8, 2026
- BRCA 318695 - CONSTRUCTIONDue Sep 30, 2026
- WWTP REPAIR CLARIFIER #2VirginiaDue Aug 27, 2026
- GRAY WALL LIVESTOCK WATER WELLDue Sep 8, 2026
- J045--Terminate - Isolate 8-inch Steam PipelineNorth CarolinaDue Aug 31, 2026
- Install Utilities - RV Campground Site - Rock Island ArsenalIllinoisDue Sep 15, 2026