Civic AI
Civic AI
Procurement intelligence
SAM.gov6982AF26Q000019
Open

NM FS SNTFE310 263(1) Gallinas Canyon Road

Response deadline
Sep 3, 2026
Due in 16 days
Date posted
Aug 18, 2026

Description

This RFQ is for geotechnical borings associated with the design and construction of Gallinas Canyon Road. The geotechnical investigation will gather subsurface data to inform the 30% project design and cost estimate. The program includes nineteen (19) planned boreholes. These boreholes fall into two categories: corridor characterization and bridge investigation. Project Locations and Descriptions: The Federal Highway Administration (FHWA), Central Federal Lands Highway Division, and the Forest Service are partnering to reconstruct a portion of FR 263, Gallinas Canyon Road. This reconstruction project includes roadway resurfacing, widening, and realignment. The realignment incorporates options for several bridge replacements and rock cuts. Gallinas Canyon lies within San Miguel County, NM. The project alignment begins at Burro Basin Trailhead and proceeds East for approximately 6 miles to the intersection of FR 263 and FR 156. The existing alignment consists of a narrow, winding road that crosses 15 bridges.

Classifications

Documents (1)

  • 6982AF26Q000019 NM FS SNTFE310 263 1 Gallinas Canyon Road.pdf
    .pdf8.9 MBNot yet available

Contacts

Similar contracts

Explore more