Exhaust Troubleshooting
- Response deadline
- Sep 24, 2026 Closed
- Date posted
- Sep 23, 2026
- Source
- Open notice
Description
Amendment 3: The purpose of this amendment is to add the answer to number 10 in the questions and answers sheet. This amendment will also extend this solicitation till 24 September 2026 at 12:00 Mountain time. All other terms and conditions of this solicitation remain unchanged. Amendment 2: The purpose of this amendment is to add the answers to the questions sent in prior to 16 September, as well as add in requested photos of the area. All other terms and condtions of this contract remain unchanged. Amendment 1: The purpose of this amendment is to change an error in "Section 3: Instructions to Offereors - Commercial Products and Services" that had letter c's SBA certification mislabeled as SDVOSB instead of Small Business. All other terms and conditions of this solicitation remain unchanged. The Government requires test and troubleshoot communications BUS to all controllers and terminal equipment. Communication BUS wiring minor repairs such as re-terminating controllers and devices is included. Major repairs such as high bay/ceiling (over 10' in height) wire replacement & device terminations or long runs (over 25') are not included. Test network and field controllers I/O control and monitoring points and equipment responses. Work with remote software engineer to verify points and equipment in graphic utility interface systems included - paint booth air handler unit's, exhaust fan's, breathing air system, chilled water system, heating water system, machine shop air handler and terminal units, and office air handler and variable air volumes. All pumps, valves and actuators. Remote software engineers operate and monitor automation systems to verify sequence of operation with on-site technicians. Please see attachments for more information.
Classifications
Documents (10)
- Attach 6 -Wage Determination.pdf.pdf4.1 MBNot yet available
- 4607.ex.jpg.jpg1.7 MBNot yet available
- Attachment 3 - Offeror Information and Certification.pdf.pdf262 KBNot yet available
- Attachment 4 - Conflict of Interest Statement.pdf.pdf134 KBNot yet available
- Attachment 5 Provisions and Clauses.pdf.pdf26 KBNot yet available
- 4607.jpg.jpg1.6 MBNot yet available
- Combined Synopsis_Solicitation Exhaust Troubleshooting.pdf.pdf291 KBNot yet available
- Attach 1 - PWS Exhaust Troubleshooting.pdf.pdf77 KBNot yet available
- FA485526Q0072 - Questions and answers.pdf.pdf75 KBNot yet available
- Attachment 2 Pricing Worksheet Exhaust Trouble Shooting.xlsx.xlsx20 KBNot yet available
Contacts
Similar contracts
- FY27 Electrical Test and CalibrationsNYDue Nov 13, 2026
- 657A5-26-111, Triennial Electrical TestingIllinoisDue Nov 13, 2026
- 460-24-009 CLC and Fourth Floor Patient Elopement SystemDEDue Nov 16, 2026
- 106 Ce Electrical Loop RepairDue Nov 10, 2026
- Project No. 583-22-106- Replace Electrical Panels & Expand DistributionDue Dec 9, 2026
- Tri-Annual PM & Testing of Switch Gears - Base YearDue Nov 12, 2026