Exhaust Troubleshooting
- Response deadline
- Sep 23, 2026 Closed
- Date posted
- Sep 10, 2026
- Source
- Open notice
Description
The Government requires test and troubleshoot communications BUS to all controllers and terminal equipment. Communication BUS wiring minor repairs such as re-terminating controllers and devices is included. Major repairs such as high bay/ceiling (over 10' in height) wire replacement & device terminations or long runs (over 25') are not included. Test network and field controllers I/O control and monitoring points and equipment responses. Work with remote software engineer to verify points and equipment in graphic utility interface systems included - paint booth air handler unit's, exhaust fan's, breathing air system, chilled water system, heating water system, machine shop air handler and terminal units, and office air handler and variable air volumes. All pumps, valves and actuators. Remote software engineers operate and monitor automation systems to verify sequence of operation with on-site technicians. Please see attachments for more information.
Classifications
Documents (7)
- Combined Synopsis_Solicitation Exhaust Troubleshooting.pdf.pdf314 KBNot yet available
- Attach 6 -Wage Determination.pdf.pdf4.1 MBNot yet available
- Attachment 3 - Offeror Information and Certification.pdf.pdf262 KBNot yet available
- Attachment 4 - Conflict of Interest Statement.pdf.pdf134 KBNot yet available
- Attachment 5 Provisions and Clauses.pdf.pdf26 KBNot yet available
- Attach 1 - PWS Exhaust Troubleshooting.pdf.pdf77 KBNot yet available
- Attachment 2 Pricing Worksheet Exhaust Trouble Shooting.xlsx.xlsx20 KBNot yet available
Contacts
Similar contracts
- FY27 Electrical Test and CalibrationsNYDue Nov 13, 2026
- 657A5-26-111, Triennial Electrical TestingIllinoisDue Nov 13, 2026
- 460-24-009 CLC and Fourth Floor Patient Elopement SystemDEDue Nov 16, 2026
- 106 Ce Electrical Loop RepairDue Nov 10, 2026
- Project No. 583-22-106- Replace Electrical Panels & Expand DistributionDue Dec 9, 2026
- Tri-Annual PM & Testing of Switch Gears - Base YearDue Nov 12, 2026