Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
- Response deadline
- Oct 19, 2026 Closed
- Date posted
- Sep 17, 2026
- Source
- Open notice
Description
As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
Classifications
Documents (3)
- Solicitation - W912DS26RA032.pdf.pdf6.3 MBNot yet available
- Phase Two of a Two Phase Design-Build Selection Procedure.pdf.pdf354 KBNot yet available
- Phase One of a Two Phase Design-Build Selection Procedure.pdf.pdf511 KBNot yet available
Contacts
Similar contracts
- FY27 Euclid Creek Fishway ConstructionDue Dec 3, 2026
- Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, MaineDue Nov 10, 2026
- Y--JELA 325250 335621 - Rehabilitate CemeteryDue Dec 10, 2026
- Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 RehabilitationDue Dec 8, 2026
- Tampa Harbor Improvements Industry DayFloridaDue Nov 18, 2026
- St. Lucie South Jetty Repair Industry DayFloridaDue Dec 7, 2026