Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
- Response deadline
- Oct 19, 2026 Due in 31 days
- Date posted
- Sep 18, 2026
- Source
- Open notice
Description
As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
Classifications
Documents (14)
- RTA 30 Package - Technical Specifications.pdf.pdf3.8 MBNot yet available
- Solicitation - W912DS26RA032.pdf.pdf6.3 MBNot yet available
- RTA_30_As-Built_Contract_4A.pdf.pdf14.2 MBNot yet available
- RTA_30_As-Built_Contract_2_Part-2.pdf.pdf20.3 MBNot yet available
- RTA_30_As-Built_Contract_2_Part-1.pdf.pdf21.2 MBNot yet available
- Phase Two of a Two Phase Design-Build Selection Procedure.pdf.pdf354 KBNot yet available
- RTA_30_As-built_Contract_5_Part 2.pdf.pdf36.4 MBNot yet available
- RTA 30 Package - Design Build RFP.pdf.pdf1.3 MBNot yet available
- Phase One of a Two Phase Design-Build Selection Procedure.pdf.pdf511 KBNot yet available
- RTA_30_As-built_Contract_5_Part 1.pdf.pdf36.7 MBNot yet available
- RTA_30_As-Built_Contract_3.pdf.pdf23.8 MBNot yet available
- RTA 30 Package - Design Drawings.pdf.pdf10.6 MBNot yet available
- RTA_30_Permits_Review Comments.pdf.pdf3.2 MBNot yet available
- RTA 30 Package - Design Documentation Report.pdf.pdf11.4 MBNot yet available
Contacts
Similar contracts
- John Day Dam Fish Pump Rehabilitation ProjectOregonDue Sep 21, 2026
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Sep 25, 2026
- Fort Pierce Harbor Maintenance Dredging, St. Lucie County, FloridaDue Oct 22, 2026
- Pointe Mouillee Confined Disposal Facility Cells 1 and 2 Fill ManagementDue Oct 13, 2026
- GAOA Sand Pond Trail Boardwalk Replacement Tahoe NFCaliforniaDue Sep 25, 2026
- Corning and Holt 10 Levee RepairsDue Sep 28, 2026