Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
- Response deadline
- Oct 19, 2026 Due in 17 days
- Date posted
- Oct 2, 2026
- Source
- Open notice
Description
As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
Classifications
Documents (17)
- RTA 30 Package - Technical Specifications.pdf.pdf3.8 MBNot yet available
- Solicitation - W912DS26RA032.pdf.pdf6.3 MBNot yet available
- RTA_30_As-Built_Contract_4A.pdf.pdf14.2 MBNot yet available
- RTA_30_As-Built_Contract_2_Part-2.pdf.pdf20.3 MBNot yet available
- RTA_30_As-Built_Contract_2_Part-1.pdf.pdf21.2 MBNot yet available
- Phase Two of a Two Phase Design-Build Selection Procedure.pdf.pdf354 KBNot yet available
- RTA_30_As-built_Contract_5_Part 2.pdf.pdf36.4 MBNot yet available
- Solicitation Amendment W912DS26RA0320001 SF 30.pdf.pdf645 KBNot yet available
- RTA 30 Package - Design Build RFP.pdf.pdf1.3 MBNot yet available
- Phase One of a Two Phase Design-Build Selection Procedure.pdf.pdf511 KBNot yet available
- RTA_30_As-built_Contract_5_Part 1.pdf.pdf36.7 MBNot yet available
- RTA_30_As-Built_Contract_3.pdf.pdf23.8 MBNot yet available
- RTA 30 Package - Design Drawings.pdf.pdf10.6 MBNot yet available
- Phase Two of a Two Phase Design-Build Selection Procedure-Amendment 0001.pdf.pdf203 KBNot yet available
- RTA_30_Permits_Review Comments.pdf.pdf3.2 MBNot yet available
- RTA 30 Package - Design Documentation Report.pdf.pdf11.4 MBNot yet available
- Phase One of a Two Phase Design-Build Selection Procedure_Amendment 0001.pdf.pdf968 KBNot yet available
Contacts
Similar contracts
- Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair, Haleiwa, Oahu, HawaiiDue Oct 8, 2026
- Tybee Island Shoreline Protection ProjectGeorgiaDue Oct 9, 2026
- Z--Bradbury Dam Outlet Valve ReplacementDue Oct 6, 2026
- Water Resources Brach Quarterly Industry Day for Coastal and Navigation ProjectsFloridaDue Oct 19, 2026
- Z--Folsom Warehouse Bridge Crane ReplacementDue Oct 9, 2026
- Z--Prosser Creek Dam Basin CleanupDue Oct 8, 2026